The project involves the construction of a traditional breakpoint nutrient reduction wetland in Floyd County, Iowa. The work includes selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure, and seeding. The estimated construction cost range for this project is $350,000 to $450,000. The project requires a pre-bid conference, and bidders must be registered with the Iowa Department of Inspections, Appeals, and Licensing.
• The project includes around 16,036 cubic yards of earthwork, installation of 1,063 square feet of steel sheetpile, water control structure, 1,985 linear feet of tile installation, 28.5 cubic yards of drainfill, 840 tons of riprap and erosion stone, 90 cubic yards of concrete grout, culvert crossing, and 13.3 acres of seeding.
• The project has a completion date of November 15, 2026, for construction and December 15, 2026, for seeding.
• The project requires a bid bond in the amount of ten percent (10%) of the contract price.
• The successful bidder shall be required to furnish a Performance/Payment Bond in an amount equal to one hundred percent (100%) of the contract price.