The South Pope Bend Road Asphalt Replacement Project involves flexible pavement structure repair, including a 1.5" TY-D overlay with a bonding course, striping, and final cleanup. The project is approximately 1.5 miles long and requires the contractor to perform level-up to restore the roadway crown and improve ride quality. The contractor must also provide traffic control, as the project site will require lane closures. The project must comply with TxDOT standards, including Item 341 - Dense-Graded Hot-Mix Asphalt, Item 351 - Flexible Pavement Structure Repair, and Item 666 - Retroreflectorized Pavement Markings.
Key aspects of the project include:
• Flexible pavement structure repair (6" and 8")
• D-GR HMA TY-D PG76-22 and D-GR HMA TY-D PG64-22 (Level-Up)
• Bonding course
• Reflectorized pavement markings (various types)
• Traffic control
• Compliance with TxDOT standards and specifications
The contractor must mobilize and start work within 30 days of receipt of a Notice-To-Proceed and complete the project within the specified timeframe.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.