Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Environmental Services
  5. ›Town of Gorham Water Quality and Flood Resiliency…

NYS Gorham, Town of·New York

Town of Gorham Water Quality and Flood Resiliency Strategic Plan

Closes 12/10/2025$80k – $120kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

PROPOSAL SPECIFICATIONS Engineering Services for the Town of Gorham Water Quality and Flood Resiliency Strategic Plan NOTE: This entire document must be submitted when quoting. Do not detach any pages. The Town of Gorham, New York requests sealed proposals for engineering services for the Town of Gorham Water Quality and Flood Resiliency Strategic Plan for a portion of the Town of Gorham that drains directly into Canandaigua Lake - approximately 12,000 acres. All proposals must be submitted on the attached Proposal Form and include the Non-Collusive Certificate as well as all other data requested on the Proposal Form. The proposal notice shall be part of the specifications. No proposals may be withdrawn after proposal opening. All proposals shall be in effect up to forty-five (45) days after proposal opening. The Town reserves the right to waive any informalities or accept or reject any or all proposals or options that it deems to best serve the needs of the Town of Gorham. AWARDING CRITERIA While the purpose of the specifications is to indicate certain minimum requirements, its use is not intended to relieve the Town of all responsibility in making a selection which is the most suitable for the Town’s service. Although proposals may be received based on the minimum requirements indicated, it is not intended that this alone shall limit the award but other factors may be considered, including the experience of the Town and others. In making any award the Town will evaluate the proposals received, considering such factors as listed below, as well as other factors, which are considered pertinent:a. Costs aligned with NYS grant and local matching funds ($125,000)b. Compliance with Proposal Specifications.c. Satisfactory completion of past similar projectsd. Qualifications and experience of individuals assigned to the projecte. Timeframe for completion QUESTIONS OR CLARIFICATIONS All requests for information (RFI) regarding the specifications shall be submitted in writing to Kevin Olvany, Watershed Program Manager, 205 Saltonstall Street, Canandaigua, NY or emailed to [email protected]. Answers to all questions will be provided by addendum to all RFP holders. The last date for RFIs to be received will be December 4, 2025. During the proposal process, and prior to proposal submittal is the time to request any clarifications, as the Town reserves the right to reject any proposals that do not meet specifications because questions were not asked. REJECTION OF PROPOSALS The Town of Gorham reserves the right to reject any and all proposals if the best interest of the Town will be served by such action. MINORITY AND WOMEN OWNED BUSINESS GOALS This project has funding from New York State Department of State and has a goal of 30% or $33,750 of the cost from Minority and Women Owned Business. Please describe how you are able to achieve the MWBE goal. COMPLIANCE WITH LAWS The Contractor shall at all times observe and comply with all laws, ordinances, and regulations of the Federal, State, and Local Government, which may in any manner affect the preparation of proposals or the performance of this Contract. TAX The Town of Gorham is exempt from paying Manufacturer’s Excise, Floor or Sales Tax and for that reason; the Bid Price shall not include any tax on the items specified. The Town of Gorham will furnish a signed exemption form covering the tax, if any, applying to the item or items covered by these specifications, as may be required by law. SCOPE OF WORK The Town of Gorham, in partnership with the Canandaigua Lake Watershed Council, is requesting proposals for engineering services to complete the Town of Gorham Water Quality and Flood Resiliency Strategic Plan for the area of the Town that drains to Canandaigua Lake (see map). In recent years, high intensity storms have brought numerous damaging floods, with multiple floods in 2023 and 2024, causing repetitive damage to roads and homes, severe erosion on agricultural fields, and significant bacteria, nutrient and sediment loading to Canandaigua Lake that closes beaches, impacts the water supply and fuels harmful algae blooms. Significant topography, long term development patterns that do not have any stormwater management, agricultural land use, and historic loss of wetlands/natural storage areas all make the Town susceptible to these high intensity storms. The Town of Gorham seeks to rebuild resiliency against the impacts of high intensity storms through a strategic plan that utilizes a comprehensive, nature-based approach. These nature-based solutions help to regain some of the ecosystem services lost in the Town and rebuild watershed resiliency. The focus of the strategic plan is to reduce pollutant loading to Canandaigua Lake through a wide breadth of projects, along with reducing flooding. Specifically, the strategic plan will include: •Hydrology modeling to further understand the peak flow rates over a variety of storms, including high intensity storms,•Developing a list of potential water quality/flood resiliency projects•Where appropriate, evaluating projects for their effectiveness at reducing pollutant loading and peak flow rates,•Prioritizing projects based on feasibility, pollutant load reduction, willingness of private landowners, potential costs, and public support.•A subset of up to 10 of the highest priority projects will be developed into preliminary designs (up to 30%) with cost estimates and water quality and runoff volume calculations to make these projects ready for future grant-funding applications for implementation. This strategic plan will be prepared with funding provided by the New York State Department of State under Title 11 of the Environmental Protection Fund. SCOPE OF SERVICES1.General hydrologic modeling on the 55+ subbasins that drain to Canandaigua Lake for a basic understanding of peak flow rates A general understanding of peak flow rates will illustrate the magnitude of flow capable for different precipitation scenarios and will be used to evaluate potential water quality/flood resiliency projects identified in Tasks 2 and 3. The Watershed Council has already mapped the 55+ subbasins that drain to the lake. The vast majority of the subbasins (~45) are less than 200 acres, where a more generalized approach, such as the rational method, should be used to determine peak flows. Three of the larger subbasins already have detailed hydrologic modeling. Seven larger subbasins will require a more detailed method (TR-55, HydroCAD, GeoHEC-HMS, or something similar), with the goal of a baseline understanding of peak flow rates. To complete this task, the contractor will work with the Watershed Council to obtain available precipitation data, land use data, and soils data that are necessary to complete peak flow rates. The contractor will then determine peak flow rates for current precipitation conditions, high intensity storm events (2-3 inches in an hour, which is becoming very common in our area), and a climate change scenario (10% increase). The Watershed Council has digitally mapped the 55+ drainage areas in the Town, using aerial imagery, LiDAR and many field visits. Detailed land cover, soils data, aerial imagery and 1-ft LiDAR contours are available for the entire drainage area.Products: peak flow rates for 55+ drainage systems under the 3 scenarios, technical report summarizing methods and results (to be used as part of Task 4 below)Costs for Task 1 shall not exceed 50% of the proposed cost. The priority is development of conceptual and preliminary designs for effective projects. 2. Identify and prioritize nature-based water quality/flood resiliency project areas Nature-based water quality/flood resiliency projects slow water movement through the watershed to filter out pollutants and decrease downstream peak flows. The Watershed Council has identified numerous potential areas for nature-based water quality/flood resiliency project areas. The contractor will work in conjunction with the Watershed Council to evaluate 15 of these potential sites and identify additional potential project sites throughout the 55 drainage systems to benefit water quality. Techniques will include both small and large water quality and flood resiliency project areas, green infrastructure/land cover practices, edge of field practices (such as Water and Sediment Control Basins or buffers), and any other practices deemed appropriate by the engineering consultant. The Watershed Council has successfully completed numerous nature-based projects throughout the watershed, which can act as examples. The Watershed Council and Town will provide technical input based on water quality data and field work during storm events. Once potential project sites area identified, the engineering consultant will develop conceptual designs, including maps depicting the existing conditions (aerial imagery, drainage features, drainage area to project site) and the proposed project area. The contractor will work with the Watershed Council, and the Town to select the highest priority projects for further development. Where appropriate, the hydrologic model/peak flow calculations will be used to complete an alternative analysis to assess the effectiveness of potential projects for pollutant load and peak flow reductions. Prioritization will be based on effectiveness of the project, cost efficiency, and private landowner willingness. Products: conceptual designs, list of the highest priority projects 3.Develop preliminary designs for up to 10 projects The engineering consultant will develop preliminary designs and associated products for up to 10 projects to make these projects ready for grant applications, including maps of existing conditions, preliminary design (up to 30%), itemized cost estimates, and water quality volume and runoff reduction volume calculations. The sites for preliminary design will be selected in consultation with the Town and Watershed Council. Draft designs will be provided to the Watershed Council, Town, and NYS DOS for their review and input at least 2 weeks prior to the end of the comment period. Products:For each high priority project area:-Preliminary design (up to 30%)-Itemized cost estimate-Water quality volume and runoff reduction volume calculations 4. Creation of a strategic plan The selected consultant will prepare a strategic plan that compiles the results from Tasks 1–3. The plan will incorporate public input, as well as feedback from the Town of Gorham, the Canandaigua Lake Watershed Council, and New York State Department of State. The strategic plan shall be provided to the project partners for review at least two weeks prior to the due date for comments. Comments must be addressed to the satisfaction of the project partners in subsequent revisions of the products. Products: draft and final strategic plan PROPOSED FEEThe NYS grant funding and local matching funds total $125,000.00. The proposed fee will include all efforts necessary to provide the required scope of work detailed above, and the following specific items:•Project kick off meeting with the Town, NYSDOS and the Watershed Program Manager•Site visits and field work required to complete each task, as detailed above•Meetings with the Town, NYSDOS and Watershed Program Manager to discuss draft products•A minimum of 2 revisions to the strategic plan, incorporating comments from the Town, Watershed Council, NYS DOS, and the public•Presentation at 2 public information meetings (meetings will be organized/facilitated by the Town and Watershed Council; however, the consultant is expected to present results at meetings) Proposal must include, but is not limited to, the following:•Description of approach to complete each task•Description of experience on similar projects•Description of qualifications of team members to work on this project•Proposed communication with the Town•Schedule to complete milestones•Budget, including technical and administrative costs•Method to achieve Minority and Women Owned Business Goals SCHEDULE•Release Date – October 30, 2025•Questions Due – December 4, 2025•Proposals Due / Bid Opening – December 10, 2025 at 1:00 pm at the Town of Gorham Town Hall•Anticipated Contract Award – December 17, 2025•Substantial Completion – June 15, 2026 TOWN OF GORHAMAFFIRMATIVE ACTION/MINORITY AND WOMEN-OWNEDBUSINESS ENTERPRISE POLICY STATEMENT The Town of Gorham has been and will continue to be an equal opportunity organization. No Minority and Women-Owned Business Enterprise (MWBE) employee or applicant for employment will be discriminated against because of race, color, religion, national origin, sex, age, disability, sexual preference or Vietnam Era Veteran status. We will take affirmative action to ensure that MWBEs, applicants and employees are treated without regard to these characteristics. To carry out our policy, the Town of Gorham will: 1. Include minority and women-owned businesses in our solicitations;2. Recruit, hire, train, place and promote persons for all jobs without regard to race, religion, color, national origin, sex, age, disability, sexual preference or Vietnam Era Veteran status;3. Take affirmative steps to ensure that MWBEs have full participation in our procurement process; and4. Administer other personnel functions, such as compensation, benefits, transfers, layoffs, returns from layoffs, and company-sponsored training, education, tuition assistance and social and recreation programs without regard to race, religion, color, national origin, sex, age, disability, sexual preference or Vietnam Era Veteran status. The Town of Gorham will periodically analyze its procurement and personnel actions to ensure compliance with this policy. Town of Gorham is an equal opportunity provider, and employer. To file a complaint of discrimination, write: USDA, Director, Office of Civil Rights, Washington, D.C. 20250-9410, or call (800) 795-3272 (voice) or (202) 7206382 (TDD). Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kevin Olvany(Watershed Program Manager)

[email protected]

(585) 396-3630

Key dates

Opened
11/18/2025
Questions due
12/4/2025
Closes
12/10/2025
Projected award
12/17/2025
Duration
1 year

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
TBD

Budget estimate

$80,000 – $120,000

The total budget for the project is $125,000, which includes NYS grant funding and local matching funds. The budget for the selected consultant will depend on their proposed fee, which should include all efforts necessary to provide the required scope of work. The consultant's fee will likely be a significant portion of the total budget, potentially ranging from $80,000 to $120,000, depending on the complexity of the project and the consultant's expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Agency of Digital Services·Vermont

Top match · 68%

ANR DEC Flood Resiliency Training

Closes 11/6/2026Opened 9/22/2026

Department of Buildings and General Services VT·Vermont

67% match

ANR DEC Flood Resiliency Training Bidder Response Form Addendum 1 Addendum 2

Closes 11/6/2026Opened 9/22/2026

Sterling Heights·Michigan

67% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

Town of Cutler Bay·Florida

66% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

North Carolina Department of Environmental Quality·North Carolina

66% match

DMS Natural Infrastructure Flood Mitigation Project (NIFMP)

Closes 3/2/2027Opened 9/3/2026

Chittenden County Regional Planning Commission·Vermont

65% match

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

South Tahoe Public Utility District·California

65% match

Engineering Services for Water System and Sewer Collection System Strategic Plans

Closes 12/11/2026Opened 10/27/2026

U.S. Department of Homeland Security - FEMA·United States of America

65% match

Fiscal Year 2026 Cooperating Technical Partners (CTP) Program - Region 4

Rolling / TBD closeOpened 6/30/2026

Environmental Conservation, NYS Department of·New York

65% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

U.S. Department of Homeland Security - FEMA·United States of America

65% match

Fiscal Year 2024 Flood Mitigation Assistance Swift Current

Closes 12/30/2026Opened 5/30/2024

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

64% match

Drought Resiliency and Water Efficiency Grant Program RFR

Closes 11/12/2026Opened 10/1/2026

City of West Miami·Florida

64% match

West Miami - City-Wide Stormwater Master Plan

Closes 11/24/2026Opened 10/22/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2026 Cooperating Technical Partners (CTP) Program - Region 3

Rolling / TBD closeOpened 6/30/2026

City of Framingham·Massachusetts

64% match

Nuisance Aquatic Vegetation Management Services For City Of Framingham’s Ponds And Sudbury River

Closes 11/19/2026Opened 10/28/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2026 Cooperating Technical Partners (CTP) Program - Region 6

Rolling / TBD closeOpened 6/30/2026

County of Ontario·New York

64% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

California Grants·California

64% match

Clean Water State Revolving Fund (CWSRF) Program

Rolling / TBD closeOpened 3/5/2025

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2026 Cooperating Technical Partners (CTP) Program - Region 7

Rolling / TBD closeOpened 6/30/2026

California Grants·California

64% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2026 Cooperating Technical Partners (CTP) Program - Region 10

Rolling / TBD closeOpened 6/30/2026

New York City Department of Design and Construction·New York

64% match

CONSTRUCTION SERVICES FOR PROPOSED EAST SIDE COAST RESILIENCY PROJECT (ESCR)

Rolling / TBD closeOpened 6/7/2019

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

64% match

Municipal Vulnerability Preparedness Planning 2.0 Program Equity Partners RFR

Closes 11/6/2026Opened 10/1/2026

Town of Eatonville·Florida

63% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Mission·Texas

63% match

RFQ: Engineering Services - Texas General Land Office (GLO) Disaster Recovery Reallocation Program (DRRP)

Closes 11/9/2026Opened 10/16/2026