Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Water and Wastewater
  5. ›Cured-In-Place-Pipe Bid

City of Big Rapids·Michigan

Cured-In-Place-Pipe Bid

Closes 6/22/2026$30k – $50kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Big Rapids is seeking a qualified contractor to perform cured‑in‑place pipe (CIPP) rehabilitation of its sanitary sewer network. The work covers a range of pipe diameters from 8 inches to 30 inches, with specified minimum liner thicknesses, and includes ancillary tasks such as removal of protruding taps and re‑establishment of active service connections. Bidders must submit unit‑price proposals, provide required bonds, insurance, and certifications, and adhere to strict performance, testing, and safety standards. The contract runs for a three‑year base period with two possible one‑year extensions. • Linear‑foot based CIPP lining for 8″–30″ sewer pipes (minimum thickness 6 mm‑12 mm). • Ancillary services: tap removal/trim and reinstatement of service leads, priced per item. • Mandatory performance bond (100 % of contract value), 5 % bid security, and compliance with ASTM testing and Michigan environmental regulations.

Attached files

Contact

[email protected]

(231) 592-4018

Key dates

Opened
6/5/2026
Questions due
6/20/2026
Closes
6/22/2026
Duration
3 years

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110

Budget estimate

$30,000 – $50,000

The bid tabulation shows three competing totals ranging from roughly $1,100 to $45,000, reflecting unit‑price assumptions based on an average of 1,000 ft/year. Assuming the City will award the contract to the lowest responsive bidder and that actual annual work volume will be near the 1,000 ft benchmark, the expected contract value is likely in the $30‑$50 k range over the three‑year base period (including ancillary items). Factors influencing the final amount include the actual linear footage of each pipe size, the number of tap removals, and any change orders for additional line segments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Buy Board Purchasing Cooperative·Texas

Top match · 77%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

Buy Board Purchasing Cooperative·Texas

75% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of Marysville, Ohio·Ohio

71% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of West Des Moines·Iowa

70% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Central Alabama Water·Alabama

70% match

Invitation to Bid – Pipe Repair Couplings

Closes 11/3/2026Opened 10/7/2026

City of Chula Vista·California

70% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

Western Virginia Water Authority·Virginia

70% match

INVITATION TO BID: WYCLIFFE AVE WATERLINE REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

City of Tampa·Florida

69% match

4" - 6" Ductile Iron Pipe (Bid Discount)

Closes 11/6/2026Opened 9/24/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

69% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

City of Appleton, WI·Wisconsin

69% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Bentonville·Arkansas

68% match

NOTICE TO BIDDERS SEWER REHAB I/I REDUCTION – CONTRACT 5 Invitation For Bid (IFB)-26-77

Closes 11/19/2026Opened 10/25/2026

Georgia City of Albany·Georgia

68% match

Bid Ref. #27-030 Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

Georgia City of Sandy Springs·Georgia

68% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Bellevue·Washington

68% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

North Carolina Orange Water & Sewer Authority·North Carolina

68% match

Construction

Closes 11/10/2026Opened 10/19/2026

Palm Beach County – Facilities Development & Operations·Florida

67% match

PIPE & FITTINGS, DUCTILE IRON, PURCHASE OF, PRE-QUAL, CTYWD

Closes 5/4/2031Opened 7/1/2026

California Department of Transportation·California

67% match

Reinforced concrete pipe trenchless installation method.

Closes 11/10/2026Opened 10/5/2026

Henry County·Georgia

67% match

(BID) 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

City of Whitehall·Ohio

67% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

Delaware County Regional Sewer District·Ohio

67% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Daytona Beach·Florida

67% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

Connecticut Town of Fairfield·Connecticut

67% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of Redlands·California

67% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Shawnee·Kansas

67% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Beaumont·California

66% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026