The Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) in support of the Proton Improvement Plan II (PIP-II) project. The DVB is a key subsystem of the Cryogenic Distribution System (CDS) and regulates and controls helium flow within the PIP-II Linac. The proposal should include the design, fabrication, assembly, testing, and delivery of the DVB.
• The DVB should be designed to operate at cryogenic temperatures and regulate helium flow.
• The proposal should include the design and fabrication of the DVB, as well as testing and delivery.
• The project requires compliance with applicable American design codes.
• The proposal should include a detailed description of the design, fabrication, and testing process.
• The offeror should provide a detailed breakdown of the costs and a project schedule.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.