The Liberty Public School District #53 is soliciting a turn‑key epoxy flooring contractor to remove existing flooring, prepare concrete, install a moisture‑vapor barrier, and apply a full epoxy flake system in multiple restrooms at Kellybrook Elementary. The work includes demolition, concrete repair, cove work, and a slip‑resistant glass‑bead additive, with all materials specified by Tnemec. The contract is a one‑vendor service agreement, expected to start June 1 2026 and reach substantial completion by July 31 2026. Bids must be sealed, mailed, and submitted by February 5 2026, with a pre‑bid meeting and site walk‑through on January 28 2026. Compliance with Missouri prevailing‑wage Order 32, insurance, and a payment bond (if > $50 k) is required.
• Scope: demolition, concrete repair, moisture barrier, epoxy primer, flake broadcast, grout coats, finish coat, cove work, slip‑resistant additive.
• Locations: six designated restrooms, nurses restroom, LMC restroom at Kellybrook Elementary, Kansas City, MO.
• Schedule: bid release Jan 13 2026 → pre‑bid Jan 28 2026 → bid due Feb 5 2026 → award Feb 18 2026 → work Jun 1 – Jul 31 2026.
• Requirements: sealed bid submission, payment bond (if > $50k), general liability ≥ $1 M/$3 M, workers’ comp, E‑Verify, prevailing‑wage compliance, safety training, references, product data sheets.