Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Acceleration and Deceleration Lane Project

Webb County·Texas

Acceleration and Deceleration Lane Project

Closes 7/9/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the construction of acceleration and deceleration lanes along U.S. Highway 83 adjacent to the Public Health Facility access point in Webb County, Texas. The work includes the removal, widening, and reconstruction of approximately 1,500 linear feet of roadway shoulder, and the construction of acceleration and deceleration lanes totaling approximately 24,000 square feet. The project aims to improve traffic operations and reduce potential conflicts between through traffic and vehicles entering or exiting the facility. The contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, traffic control devices, and incidentals required to complete the work in accordance with the plans, specifications, and contract documents. Key features of the project include: • Mobilization and project administration • Traffic control, barricades, warning signs, and traffic handling • Removal of existing flexible base materials • Asphalt pavement milling and removal • Placement and compaction of flexible base materials • Application of tack coat • Placement of Type “C” Hot-Mix Asphalt Concrete pavement • Pavement striping and traffic markings • Shoulder widening and related roadway improvements The estimated project time is 45 calendar days.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Juan Guerrero(Contract Administrator)

[email protected]

(956) 523-4149

Key dates

Opened
6/18/2026
Questions due
6/26/2026
Pre-bid meeting
6/26/2026
Closes
7/9/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
ITB 2026-008 Paseo De Los Santos Addendum 1

Budget estimate

$500,000 – $1,500,000

The budget for this project can be estimated based on the scope of work and the materials required. The construction of acceleration and deceleration lanes, including the removal and reconstruction of roadway shoulders, and the placement of asphalt pavement, can be a significant undertaking. Considering the estimated project time of 45 calendar days, the budget could be substantial. Assuming an average cost of $100 per ton of asphalt, and an estimated 1,000 tons of asphalt required for the project, the total cost for asphalt alone would be $100,000. Additionally, the cost of labor, equipment, and other materials would add to the total cost. Based on these estimates, the budget for this project could be in the range of $500,000 to $1,500,000. However, this is a rough estimate and the actual budget could vary depending on various factors, including the contractor's bid, the complexity of the project, and any unforeseen expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pasadena·California

Top match · 65%

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Orlando·Florida

63% match

Transportation Engineering and Planning Services for Safe Speeds Lab

Closes 11/5/2026Opened 10/5/2026

City of Orange·California

63% match

26-27.13 - RF PROPOSAL - 26-27.13 - Traffic Engineering Services - Bike Lane Project

Closes 11/19/2026Opened 10/29/2026

Idaho Transportation Department·Idaho

62% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

LA Public Works Engineering Bureau·California

62% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

California Grants·California

62% match

2026 Solutions for Congested Corridors Program

Closes 11/19/2026Opened 9/30/2026

National Aeronautics And Space Administration·United States of America

62% match

TECHNOLOGY TRANSFER OPPORTUNITY: Aerospace Vehicle Entry Flightpath Control (TOP2-303)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Transportation·District of Columbia

62% match

Accelerating Market Readiness Program

Closes 10/28/2029Opened 10/29/2024

City of Columbus·Ohio

61% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

U.S. Department Of Veterans Affairs·California

61% match

Y1LB--FY27 NRM - Correct Mather Loop Road and Install Speed Bumps

Closes 11/2/2026Opened 10/26/2026

City of Charlotte·North Carolina

61% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

National Aeronautics And Space Administration·Alabama

61% match

TECHNOLOGY TRANSFER OPPORTUNITY: Aerospace Vehicle Entry Flightpath Control (TOP2-303)

Closes 8/10/2027Opened 8/10/2026

City of Charlotte·North Carolina

61% match

Mt Holly-Huntersville Road Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Idaho Transportation Department·Idaho

61% match

Key No. 23731 NORTHSIDE BLVD & KARCHER RD

Closes 11/17/2026Opened 10/29/2026

City of Austin·Texas

61% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

LA Public Works Engineering Bureau·California

61% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Charlotte·North Carolina

61% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Central Ohio Transit Authority (COTA)·Ohio

61% match

Pedestrian and Collision Avoidance – ADAS Pilot Program

Closes 11/16/2026Opened 10/14/2026

City of Charlotte·North Carolina

61% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

Metropolitan Council·Minnesota

61% match

Collision Avoidance System (CAS) Pilot

Closes 11/13/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

61% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

Maryland State Highway Administration·Maryland

61% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

Minnesota Department of Transportation·Minnesota

61% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

City of Lancaster·Texas

61% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

City of Charlotte·North Carolina

61% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027