Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Civil Engineering
  5. ›Request for Letters of Interest: BL-0052 Main Street…

North Carolina Town of Holly Springs·North Carolina

Request for Letters of Interest: BL-0052 Main Street Sidewalk Connector (TOHS Project #22-007)

Closes 3/20/2026$500k – $1MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Holly Springs is seeking a private engineering consulting firm to provide Construction Engineering and Inspection (CEI) and Construction Contract Administration (CA) services for the Main Street Sidewalk project. The project involves the construction of approximately 1,125 linear feet of sidewalk on the east side of N. Main Street from Arbor Creek Drive to Trellis Point Drive. The selected firm will be responsible for ensuring that all work performed by the contractor meets the requirements of the plans, specs, contract, and NCDOT standards. Key responsibilities include contract administration, project management, and project documentation. • The firm must have experience with federal and NCDOT funded sidewalk improvement projects. • The firm must be pre-qualified by the North Carolina Department of Transportation (NCDOT) to perform the required discipline codes. • The firm must have a good ethical and professional standing. • The firm must have the financial ability to undertake the work and assume the liability. • The firm must have an adequate accounting system to identify costs chargeable to the project.

Attached files

Contact

Morgan Nelson(Project Manager)

[email protected]

(919) 557-3936

Key dates

Opened
2/24/2026
Questions due
3/9/2026
Closes
3/20/2026
Projected award
4/6/2026
Duration
6 months

Last updated

Details

Type
Request for Expression of Interest
Industry
Civil Engineering
NAICS
541330
Solicitation №
440-BL-0052 (TOHS #22-007)

Budget estimate

$500,000 – $1,000,000

The budget for this project is estimated to be around $500,000 to $1,000,000, based on the scope of work and the fact that it is a federal and NCDOT funded project. The cost-plus payment type also suggests that the budget will be based on the actual costs incurred by the contractor, which could range from $500,000 to $1,000,000. Factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the selected firm, and the availability of funds from the NCDOT.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Rogers·Arkansas

Top match · 77%

REQUEST FOR LETTERS OF INTEREST - US-71B CORRIDOR STUDY AND RAILYARD LOOP TRAIL UNDERCROSSING STUDY

Closes 11/3/2026Opened 10/13/2026

City of Rogers·Arkansas

76% match

Request for Letters of Interest – US‑71B Corridor Study & Railyard Loop Trail Undercrossing Feasibility Studies

Closes 11/3/2026Opened 10/11/2026

City of Rogers·Arkansas

76% match

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Rogers·Arkansas

74% match

REQUEST FOR LETTERS OF INTEREST - DEMONSTRATION PROJECT DESIGN AND CONST. ENG. AND INSPCTN SVCS

Closes 11/3/2026Opened 10/13/2026

Panola County Board of Supervisors·Mississippi

73% match

Northwest Community College School of Aeronautics Taxilane Connector Project

Closes 11/3/2026Opened 10/12/2026

City of Rogers·Arkansas

73% match

SS4A Demonstration Project Design and Construction Engineering and Inspection Services Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Rogers·Arkansas

73% match

REQUEST FOR LETTERS OF INTEREST- HIGH INJURY NETWORK LIGHTING, SIGNING, AND STRIPING STUDY

Closes 11/3/2026Opened 10/13/2026

NYS Capital Region Transportation Council·New York

73% match

Town of Stillwater County Route 76 Corridor Study

Closes 11/27/2026Opened 10/26/2026

Agency of Transportation - Contract Administration·Vermont

73% match

Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal

Closes 4/2/2027Opened 9/15/2026

City of Portland·Maine

73% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

72% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

Town of Westwood·Massachusetts

72% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

County of DeKalb, GA·Georgia

72% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Rogers·Arkansas

72% match

SS4A High Injury Network Lighting, Signing, and Striping Study Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

Georgia DeKalb County Government·Georgia

72% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

City of Fort Wayne·Indiana

72% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Rogers·Arkansas

71% match

High Injury Network Lighting, Signing, and Striping Study – Request for Letters of Interest

Closes 11/3/2026Opened 10/11/2026

City of Palm Springs·California

71% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Cleveland·Ohio

71% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

Ohio City of Westerville·Ohio

71% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of San Antonio·Texas

71% match

23-03900 Hays Street Bridge Connections & Eastside Area Streets (2022 Bond)

Closes 11/6/2026Opened 9/30/2026

Maryland Baltimore City Department of Transportation·Maryland

71% match

TR-27006 CURB REPAIR CITYWIDE

Closes 11/18/2026Opened 10/24/2026

Maryland Carroll County Government - Procurement·Maryland

71% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

New York City Department of Design and Construction·New York

71% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

71% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026