Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›Installation of new 120'x15" tile at US-59 & Station…

Iowa Department of Transportation·Iowa

Installation of new 120'x15" tile at US-59 & Station 494+51 - RP 208.32 (Osceola County)

Closes 3/10/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Iowa Department of Transportation is seeking bids for the installation of a new 120'x15" tile at US-59 & Station 494+51 - RP 208.32 in Osceola County. The project involves trenchless construction and open trench construction. The contractor will be responsible for supplying all labor, materials, and equipment to install the tile crossing. The project requires traffic control, and the contractor must comply with the Iowa DOT's Standard Specifications for Highway and Bridge Construction. • The project involves installing 120 feet of 15" diameter tile across highway US 59 and Station 494+51 (RP 208.32). • The section of tile crossing under the highway from toe of foreslope to toe of foreslope shall be installed via trenchless construction. • The balance of the crossing may be installed via open trench construction using like materials as the trenchless construction. • The contractor shall connect the new tile crossing to the existing tile per Iowa DOT Standard Road Plan DR-122. • The installation of inspection access will be completed per Standard Road Plan DR-302. • Materials shall meet one of the following requirements: Section 2553.02 A.2.b. Restrained Joint Ductile Iron Pipe or Restrained Joint PVC Pipe, or Section 2553.02 B. Casing Pipe with a minimum wall thickness of 0.375 inches.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kyle Williams(Purchasing Agent)

[email protected]

(515) 233-7960

Key dates

Opened
2/13/2026
Closes
3/10/2026
Duration
210 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
645-RFB-2497-2026

Budget estimate

$200,000 – $500,000

Based on the information provided, it is difficult to estimate the exact budget for this project. However, considering the scope of work, which includes the installation of a new 120'x15" tile at US-59 & Station 494+51 - RP 208.32 in Osceola County, the budget could be in the range of $200,000 to $500,000. This estimate is based on the assumption that the project will require significant labor, materials, and equipment costs. Factors that may influence the likely payment range include the complexity of the project, the contractor's experience and expertise, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Iowa Department of Transportation·Iowa

Top match · 78%

Installation of new 240'x12" tile at US-30 (MM160.37 & STA 2234+90) in Story County

Closes 11/12/2026Opened 10/22/2026

Iowa Transportation·Iowa

75% match

Installation of new 240'x12" tile at US-30 (MM160.37 & STA 2234+90) in Story County

Closes 11/12/2026Opened 10/20/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

70% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

70% match

20--TILE

Closes 11/22/2026Opened 10/8/2026

Minnesota Department of Transportation·Minnesota

69% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

City of Fairfield·Ohio

69% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

NYS Cortland County·New York

69% match

RFP - Cortland County Courthouse Spray Foam Installation

Closes 11/19/2026Opened 10/30/2026

Lewis County Schools·West Virginia

69% match

Lewis County Schools Flooring Bid Package (On-Call Flooring Repair, Replacement, Removal & Installation)

Closes 11/4/2026Opened 10/21/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

68% match

UNIT P20A.0100139 OPERATOR DISPLAY (ODU)

Closes 12/31/2026Opened 4/9/2026

U.S. Department Of Defense·United States of America

68% match

20--TILE 24 X24 INCH

Closes 11/29/2026Opened 10/15/2026

Minnesota Department of Transportation·Minnesota

68% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

Marinette County·Wisconsin

68% match

RFB #26-015-34 - Law Enforcement Center Roof Replacement

Closes 11/16/2026Opened 9/29/2026

County of Okaloosa·Florida

68% match

Okaloosa County Jail - Delta Pod - Complete Shingle Re-Roof

Closes 11/18/2026Opened 10/26/2026

Missouri Department of Transportation·Missouri

68% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

Minnesota Department of Transportation·Minnesota

68% match

Grading, Concrete & Bituminous Surfacing, Lighting, and Bridge No.s 53827‑53830

Closes 11/4/2026Opened 10/16/2026

Iowa Transportation·Iowa

67% match

Wired Tile Camera System with Monitor, Built in Locator, and Self Leveling Camera

Closes 10/30/2026Opened 10/28/2026

Sumter County·South Carolina

67% match

Sumter-Lee Regional Detention Center Steel Cell Flooring Retrofit

Closes 11/3/2026Opened 10/6/2026

Georgia Department of Transportation·Georgia

67% match

T32-D4-PavePRes-Coffee-SR268-193832

Closes 11/5/2026Opened 10/21/2026

Texas Department of Transportation·Texas

67% match

STATE LET MAINTENANCE CONTRACT, CORYELL CO, BASE FAILURE PAVEMENT REPAIR

Closes 11/3/2026Opened 10/8/2026

Stafford County Public Schools·Virginia

67% match

IFB # 27-SCPS-016, On-Call Tile and Carpet Services

Closes 11/18/2026Opened 10/14/2026

Minnesota Department of Transportation·Minnesota

67% match

260134 SP 6222-196

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

67% match

20--TILE

Closes 11/22/2026Opened 10/7/2026

Texas Health & Human Services Commission·Texas

67% match

Rio Grande State Center needing removal and installation of flooring in Unit 1, Building 515

Closes 11/5/2026Opened 10/15/2026