The City of Santa Ana is soliciting bids for the “Business Area Road Improvements” (Project #26‑6700) covering a corridor on MacArthur Place. The contract includes full street‑rehabilitation: grinding and overlay of existing asphalt, localized reconstruction, installation of new concrete sidewalks, curb & gutter, curb ramps, driveways, retaining curbs, median islands, bus pads, and full signing & striping. Utility work includes adjustment of water‑valve, sewer, and electrical frames, installation of detector loops and conduit, and tree‑root shaving where required. The work must be completed within a 45‑working‑day schedule and is subject to prevailing‑wage, CARB, and Community Workforce Agreement requirements.
• Scope: Cold‑milling, asphalt‑rubber hot‑mix placement, PCC sidewalks/curbs, utility frame adjustments, detector‑loop installation, signage, striping, and tree‑root shaving.
• Bonds & Licenses: 10 % bid bond, 100 % performance/payment bonds, California Class “A” contractor license, CARB CRCs, and $8,000 construction‑permit fee.
• Schedule: Bid due 2 pm Feb 25 2026; construction must start after notice to proceed and be finished within 45 working days; liquidated damages $3,910 per day.
• Compliance: Prevailing‑wage, CALGreen 65 % waste‑diversion, CWA (≥30 % local‑resident labor), and Assembly Bill 4216 dig‑alert notice (2‑working‑day prior).