Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Rehabilitation of Prestressed Concrete Cylinder Pipe…

Tarrant Regional Water District·Texas

Rehabilitation of Prestressed Concrete Cylinder Pipe (PCCP) using Carbon Fiber Reinforced Polymer (CFRP)

Closes 11/10/2025$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Tarrant Regional Water District (TRWD) is seeking proposals for the rehabilitation of prestressed concrete cylinder pipe (PCCP) using carbon fiber reinforced polymer (CFRP). The project involves installing one continuous 72’ area of CFRP lining over three segments of a 72” diameter PCCP pipeline under Onward Road. The work includes furnishing labor, materials, tools, equipment, transportation, storage, and supervision required for the design, supply, and installation of internally bonded CFRP. • The pipeline is a 72” diameter pre-stressed concrete cylinder pipe (PCCP) located under Onward Road. • The project requires the installation of one continuous 72’ area of CFRP lining over three segments of the pipeline. • The work includes furnishing labor, materials, tools, equipment, transportation, storage, and supervision required for the design, supply, and installation of internally bonded CFRP. • The project must be completed by the end of TRWD’s planned winter maintenance shutdown in February and March 2026. • The work should take no more than a 3-week time frame to be completed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Courtney Jalbert(Purchasing Supervisor)

[email protected]

(817) 372-0302

Key dates

Opened
10/14/2025
Questions due
11/3/2025
Pre-bid meeting
10/27/2025
Closes
11/10/2025
Projected award
12/16/2025
Duration
3 weeks

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
26-018

Budget estimate

$200,000 – $500,000

The budget for this project is not explicitly stated, but based on the scope of work, it can be estimated to be in the range of $200,000 to $500,000. This estimate is based on the cost of materials, labor, and equipment required for the rehabilitation of a 72” diameter prestressed concrete cylinder pipe. The actual budget may vary depending on the contractor's bid and the district's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Buy Board Purchasing Cooperative·Texas

Top match · 69%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

West County Wastewater·California

68% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

California Department of Transportation·California

68% match

Reinforced concrete pipe trenchless installation method.

Closes 11/10/2026Opened 10/5/2026

Buy Board Purchasing Cooperative·Texas

68% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City Utilities·Indiana

67% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

Town of Honea Path·South Carolina

67% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of West Des Moines·Iowa

66% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Albany·Georgia

66% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Chula Vista·California

66% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Laguna Hills·California

66% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Charlotte·North Carolina

66% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

City of Marysville, Ohio·Ohio

66% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

Greenwood Metropolitan District·South Carolina

66% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Carlsbad·California

66% match

Vista/Carlsbad Reach VC-2 Manhole Rehabilitation Project

Closes 11/2/2026Opened 10/21/2026

City of Redlands·California

65% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of San Bernardino·California

65% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Rancho Palos Verdes·California

65% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

Georgia City of Sandy Springs·Georgia

65% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Culver City·California

65% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Neptune Beach·Florida

65% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City and County of San Francisco·California

65% match

EXT REC | CON26-0042 West SF CPA Replace - MLBE

Closes 12/31/2026Opened 3/4/2026

U.S. Department Of Defense·Pennsylvania

65% match

81--CYLINDER,COMPRESSED, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

65% match

CYLINDER,COMPRESSED

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Pennsylvania

64% match

CYLINDER,PNEUMATIC,

Closes 12/14/2026Opened 9/15/2026

City of Long Prairie·Minnesota

64% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026