Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Fabrication of PIP-II GMPS CAPACITORS

U.S. Department Of Energy·Illinois

Fabrication of PIP-II GMPS CAPACITORS

Closes 8/20/2026$1M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Fermi National Accelerator Laboratory (Fermilab) is seeking a subcontractor to design, manufacture, test, and deliver Booster GMPS Power Supply Girder Resonant Capacitors. The capacitors must meet specific technical requirements, including dielectric material, internal termination style, and overall construction. The subcontractor must also demonstrate their ability to predict and document capacitor performance, including capacitance, lifetime, and operating characteristics. The proposal must include a technical proposal, a business management and price proposal, and a small business subcontracting plan. The subcontractor must also demonstrate their experience and capability to manufacture capacitors of similar complexity and operating characteristics. • The subcontractor must provide a firm-fixed-price proposal for the GMPS Capacitors. • The subcontractor must demonstrate their ability to meet or exceed the technical requirements identified in the Technical Specification 0323–ES–282493 REV A. • The subcontractor must provide a quality management system and testing capabilities that meet or exceed the requirements identified herein. • The subcontractor must demonstrate their capability to perform all inspections and acceptance tests required by Section 5 of Technical Specification 0323–ES–282493 REV A. • The subcontractor must provide complete inspection reports, test reports, material certifications, and manufacturing documentation with each delivered capacitor.

Attached files

Contact

Richard Konan(Procurement Specialist)

[email protected]

(630) 840-2835

Key dates

Opened
7/22/2026
Questions due
8/6/2026
Closes
8/20/2026

Last updated

Details

Type
Request for Proposal
Industry
Manufacturing
NAICS
335999
Solicitation №
383185-RK

Budget estimate

$1,000,000 – $5,000,000

The budget for this opportunity is estimated to be around $1 million to $5 million. This estimate is based on the fact that the subcontractor is required to manufacture and deliver 700 capacitors, with a firm-fixed-price proposal for each capacitor. The price for each capacitor is not specified, but based on industry standards, it is estimated to be around $1,000 to $5,000 per capacitor. The subcontractor must also provide a small business subcontracting plan, which may require them to subcontract a portion of the work to small businesses, potentially increasing the overall cost of the project. Additionally, the subcontractor must demonstrate their experience and capability to manufacture capacitors of similar complexity and operating characteristics, which may also impact the overall cost of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Energy·Illinois

Top match · 62%

PIP-II CM 2K Reclosable Pressure Safety Relief Valves

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Energy·California

61% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

60% match

POWER SUPPLY

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

60% match

61--POWER SUPPLY

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Energy·Illinois

60% match

PIP-II Niobium Sheets, Rings, and Disks

Closes 11/10/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

59% match

PROCESSOR ASSEMBLY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

59--CAPACITOR,FIXED,PLASTI

Closes 11/11/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

59% match

59--CAPACITOR,FIXED,CERAMI

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

59% match

CAP,VALVE

Closes 11/26/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

59% match

CAP, VENT, ASSEMBLY

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

59% match

CAP

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

59% match

POWER SUPPLY

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

CAP,VALVE

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

58% match

59--CAPACITOR-RESISTOR

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

58% match

POWER SUPPLY

Closes 12/29/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

58% match

POWER SUPPLY

Closes 11/24/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

58% match

CIRCUIT CARD ASSEMB

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

58% match

Power Construction and Services II (PCS II) MATOC

Closes 11/3/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

58% match

POWER SUPPLY

Closes 11/30/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

58% match

CIRCUIT CARD ASSEMB

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

58% match

POWER SUPPLY

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Energy·Illinois

58% match

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Closes 11/19/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

58% match

PD-42-0030; PIP – Rolls Royce Marine Gas Turbines

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

58% match

59--CIRCUIT CARD ASSEMB

Closes 1/29/2027Opened 10/7/2026

U.S. Department Of Defense·Oklahoma

57% match

New Manufacture: B-2 Power Supply, NSN 6130012631583FW

Closes 11/23/2026Opened 10/7/2026