Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›47--FITTING,DUAL OUTLET

U.S. Department Of Defense·Ohio

47--FITTING,DUAL OUTLET

Closes 1/20/2026$5k – $50kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Defense Logistics Agency is soliciting quotes for the procurement of a dual outlet fitting, with a National Stock Number (NSN) of 4730016260042. The solicitation is an RFQ, and all responsible sources may submit a quote. The approved source is 3R5K2 823540. Quotes must be submitted electronically, and hard copies of the solicitation are not available. • The quantity required is 12 units. • The delivery location is W1A8 DLA DIST SAN JOAQUIN. • The delivery period is 0167 days. • Specifications, plans, or drawings are not available.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
1/8/2026
Closes
1/20/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
332996
Solicitation №
SPE7M326T2289

Budget estimate

$5,000 – $50,000

The budget for this opportunity is difficult to estimate without knowing the unit price of the dual outlet fitting. However, based on the quantity required (12 units) and the delivery period (0167 days), it can be assumed that the budget will be in the range of a few thousand dollars to tens of thousands of dollars. The actual budget will depend on the price quoted by the supplier and the terms of the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 67%

59--ADAPTER,DUAL OUTPUT

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·Oklahoma

66% match

47--ADAPTER,STRAIGHT,FLANG

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

65% match

47--CONNECTOR,MULTIPLE,FLU

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

65% match

47--ADAPTER,OIL SWITCH

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·California

63% match

47--COUPLING,PIPE

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·Florida

63% match

47--COUPLING HALF,QUICK DI

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·California

63% match

47--PLUG,HOSE

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

63% match

47--COUPLING,TUBE

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·California

62% match

47--COUPLING HALF,QUICK DI

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

47--PLUG,TUBE REPAIR

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

62% match

47--ADAPTER,STRAIGHT,PI

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·California

62% match

47--COUPLING HALF,SELF-SEA

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

47--COUPLING HALF,QUICK DI

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

47--SPOOL PIECE,OUTLET

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

47--COUPLING HALF,QUICK

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

47--CONNECTION,FLEXIBLE

Closes 11/20/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

47--COUPLING HALF,QUICK DI

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

61% match

47--COUPLING ASSEMBLY,QUIC

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

47--PLUG,QUICK DISCONNE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

47--EXPANSION JOINT,PIPE

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

61% match

47--CONNECTION,FLEXIBLE

Closes 12/18/2026Opened 9/17/2026

U.S. Department Of Defense·United States of America

61% match

47--COUPLING ASSEMBLY,TUBE

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

47--CONNECTION,FLEXIBLE

Closes 11/20/2026Opened 10/22/2026

U.S. Department Of Energy·California

61% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

59--ADAPTER,CONNECTOR

Closes 11/12/2026Opened 10/29/2026