Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›MUSC CSB 4th Floor Corridor Renovation

Medical University Hospital Authority (MUHA)·South Carolina

MUSC CSB 4th Floor Corridor Renovation

Closes 10/15/2026$500k – $1.2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This opportunity is a design‑build interior renovation of the fourth‑floor corridor in the MUSC Clinical Science Building. The scope covers selective demolition, re‑configuration of existing spaces, and installation of new architectural finishes, ceilings, and flooring, with coordination required for hazardous‑material abatement. The contractor will work closely with the university’s project coordinator and must manage all phases from demolition through final finishes. • Interior demolition and removal of existing finishes • Re‑configuration of corridor layout and space usage • Installation of new ceilings, flooring, and architectural finishes • Coordination with an abatement contractor for hazardous‑material handling • Design‑build delivery method requiring integrated design and construction responsibilities

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Antonio White(Agency Project Coordinator)

[email protected]

(843) 792-4669

Key dates

Opened
9/14/2026
Closes
10/15/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
H51-P019

Budget estimate

$500,000 – $1,200,000

No contract value is disclosed. Based on typical interior renovation costs for institutional corridors (approximately $250‑$500 per square foot) and assuming a corridor size of 2,000–3,000 sq ft, the total contract value is likely in the $500,000 to $1,200,000 range. Factors influencing the estimate include the extent of demolition, the quality of finishes selected, and coordination with hazardous‑material abatement.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Medical University of South Carolina (MUSC)·South Carolina

Top match · 84%

MUSC CSB 4th Floor Corridor Renovation #H51-P019

Closes 11/24/2026Opened 9/16/2026

The Ohio State University·Ohio

67% match

OSU-240175, Research Admin Bldg - 4th Floor Renovation

Closes 11/19/2026Opened 10/28/2026

Virginia Commonwealth University·Virginia

64% match

2026-03145 - Cabell Library 4th Floor Special Collections Renovation 2025

Closes 11/17/2026Opened 10/14/2026

Columbus State Community College·Ohio

62% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

North Carolina School of Science and Mathematics·North Carolina

62% match

NC School of Science and Math

Closes 11/17/2026Opened 10/26/2026

Northeast Wisconsin Technical College·Wisconsin

62% match

DO_CO and AG_SC Comp

Closes 11/24/2026Opened 10/28/2026

UCLA Capital Programs·California

62% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 18b - Wall Protection)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

62% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 14 - Resilient Flooring)

Rolling / TBD closeOpened 10/23/2026

College of Charleston·South Carolina

62% match

Berry Residence Hall and Honors Program Renovation - Phase G

Closes 11/12/2026Opened 10/21/2026

Missouri Office of Administration·Missouri

62% match

Repair & Renovate Interior Judiciary Library - Supreme Court of Missouri

Closes 11/5/2026Opened 10/20/2026

UCLA Capital Programs·California

62% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 9 - Doors/ Frames/ Hardware)

Rolling / TBD closeOpened 10/23/2026

The University of North Carolina·North Carolina

62% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

Montana Department of Administration, Architecture & Engineering Division·Montana

62% match

Hamilton Hall - Life-Safety Improvements / 3rd & 4th Floor Renovations

Closes 11/18/2026Opened 10/14/2026

State University of New York (SUNY)·New York

61% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

Michigan Memphis Community Schools·Michigan

61% match

District Wide Renovations

Closes 11/16/2026Opened 10/19/2026

UCLA Capital Programs·California

61% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Casework / Millwork)

Rolling / TBD closeOpened 10/23/2026

University of North Dakota·North Dakota

61% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

UCLA Capital Programs·California

61% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

City of St. Cloud·Florida

61% match

City Hall 3rd Floor Renovations

Closes 11/19/2026Opened 10/4/2026