Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›MODULE ASSEMBLY,RIM

U.S. Department Of Defense·United States of America

MODULE ASSEMBLY,RIM

Closes 2/12/2027$50k – $250kRequest for Quotation
Get bids like this by emailBid source

Description

This solicitation calls for the manufacture and delivery of a specific module assembly (the “RIM”) under a fixed‑price, non‑commercial contract. The contractor must comply with DLA‑specified quality, inspection, marking, and security requirements, and must submit a price quote by the response deadline. The award will be based on the Lowest Price Technically Acceptable (LPTA) evaluation. • Provide the MODULE ASSEMBLY,RIM as per the design referenced by CAGE codes 53711 and 8358931. • Ensure compliance with MIL‑STD‑130 marking, MIL‑STD‑2073 packaging, and ANSI/ESD S20.20 electrostatic discharge control. • Submit all required documentation (e.g., DD Form 254, certifications, and electronic invoices/receiving reports) via PIEE‑WAWF.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(717) 601-4728

Key dates

Opened
10/29/2026
Closes
2/12/2027

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
334412
Solicitation №
SPRMM127QHA16

Budget estimate

$50,000 – $250,000

The solicitation does not disclose a contract value. Based on typical DLA‑level module assembly contracts, the scope (single‑item, non‑commercial, fixed‑price) usually falls in the low‑to‑mid‑six‑figure range. Assuming modest material costs, tooling, and labor, a reasonable estimate is between $50 K and $250 K. Factors influencing the final amount include the volume of units ordered, any OEM‑specific part number requirements, and additional compliance documentation (e.g., security clearances).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 95%

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

U.S. Department Of Defense·United States of America

83% match

MODULE ASSEMBLY,UHF

Closes 1/21/2027Opened 10/20/2026

U.S. Department Of Defense·United States of America

83% match

DISCHARGE MODULE

Closes 11/9/2026Opened 9/9/2026

U.S. Department Of Defense·Pennsylvania

82% match

DISCHARGE MODULE

Closes 11/9/2026Opened 6/10/2026

U.S. Department Of Defense·United States of America

80% match

DROP BAR ASSEMBLY

Closes 1/19/2027Opened 10/21/2026

U.S. Department Of Defense·United States of America

80% match

61--MODULE ASSEMBLY,FRE

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

80% match

CIRCUIT CARD ASSEMB

Closes 1/11/2027Opened 9/22/2026

U.S. Department Of Defense·Pennsylvania

80% match

58--RF MODULE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

80% match

CONTROL MODULE

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

79% match

10--ROTOR ASSEMBLY,M61A

Closes 11/6/2026Opened 8/20/2026

U.S. Department Of Defense·United States of America

79% match

CIRCUIT CARD ASSEMB

Closes 12/3/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

79% match

MOTOR, CONTROL

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

79% match

POWER SUPPLY

Closes 11/2/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

79% match

CIRCUIT CARD ASSEMB

Closes 12/1/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

79% match

53--LOCK,RIM

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

79% match

D.E.R.M.

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

79% match

POWER SUPPLY

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

78% match

ELECTRONIC COMPONEN

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

78% match

30--CYLINDER ASSEMBLY,A

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

78% match

Wheel Assembly, Pneumatic

Closes 12/17/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

78% match

CCA,MAIN LINK MODUL

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

78% match

Cylinder Assembly

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Defense·Utah

78% match

Cylinder, Assembly, A

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

78% match

VALVE ASSEMBLY

Closes 12/4/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

78% match

CIRCUIT CARD ASSEMB

Closes 11/27/2026Opened 10/28/2026