The United States Navy is soliciting a quotation for the procurement of a flowmeter. The flowmeter must meet the design, manufacture, and performance requirements specified in the contract. The contractor must maintain the total equipment baseline configuration and provide contractor drawings showing the latest assembly configuration to the government in electronic format. The flowmeter must be physically identified in accordance with MIL-STD-130, and the contractor must maintain records of departures from contractor-imposed requirements. The delivery of material must be on or before 20 days after the effective date of the resulting contract.
Key points to consider:
• The flowmeter must meet the design, manufacture, and performance requirements specified in the contract.
• The contractor must maintain the total equipment baseline configuration.
• The flowmeter must be physically identified in accordance with MIL-STD-130.
• The contractor must maintain records of departures from contractor-imposed requirements.
• The delivery of material must be on or before 20 days after the effective date of the resulting contract.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.