The Town of Smyrna is seeking a qualified contractor to repair a damaged segmental‑block MSE retaining wall, replace a deteriorated guardrail, and restore the roadway surface at the intersection of Industrial Boulevard and Team Boulevard. The work includes demolition, excavation, back‑filling, installation of a new MSE wall with geosynthetic reinforcement, replacement of concrete curb and gutter, installation of a new concrete barrier rail, asphalt pavement removal and resurfacing, traffic‑control and erosion‑control measures, and coordination with existing utilities. The contract is a sealed‑bid, award‑by‑price solicitation with a 120‑day performance period and liquidated damages of $500 per day for overruns. Bidders must hold a Tennessee contractor’s license and obtain a Smyrna business license.
• Demolition of existing guardrail, retaining wall segment, curb, gutter, and asphalt pavement.
• Construction of a new MSE retaining wall, concrete curb & gutter, and concrete barrier rail with required geosynthetic reinforcement.
• Full roadway reconstruction (asphalt removal, base preparation, resurfacing) and installation of traffic‑control and erosion‑prevention devices.
• Mandatory bonding (100 % performance bond), insurance, and compliance with all local, state, and federal regulations.