The City of Milwaukee is soliciting sealed bids for two street‑level infrastructure improvement projects in the north side of Milwaukee. The work involves the removal and replacement of existing pavement, concrete walkways, driveways, curbs, gutters, and associated drainage components, as well as the installation of bioswales and storm‑water drainage structures. All work must be completed by November 25, 2026, with liquidated damages of $1,000 per day for late completion. The bid includes a comprehensive item list covering mobilization, earthwork, concrete, asphalt, drainage, and landscaping items, and requires compliance with SBE, Resident Preference, and Apprenticeship program requirements. Bidders must have a digital ID, submit a $50 per‑bid fee (or subscription), and provide a 10 % bid bond.
• Replace variable‑thickness asphaltic concrete pavement on two street sections (N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. and N. 37th St. – N. Hopkins St. to W. Hampton Ave.)
• Perform concrete walk, driveway, curb‑and‑gutter removal and replacement, pavement grinding, manhole/inlet adjustments, and install bioswales and storm‑water drainage (8‑in. and 12‑in. PVC pipe, gravel, granite cobbles, etc.)
• Provide all associated materials, labor, equipment, and required bid security; adhere to City of Milwaukee SBE (25 % participation), Resident Preference (40 % worker‑hour) and Apprenticeship (as applicable) mandates.