Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

U.S. Department Of Defense·Pennsylvania

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 9/21/2026$50k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Navy is seeking a contractor to repair circuit card assemblies. The contractor will be responsible for performing all inspection requirements and ensuring that the repaired items meet the operational and functional requirements of the original manufacturer's specifications and drawings. The contractor must also comply with all applicable documents, including military specifications and standards. The repair turnaround time (RTAT) is 53 days, and the contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Some key points to consider include: • The contractor must verify nomenclature, part number, and NSN prior to responding to the solicitation. • The contractor must provide a quote that includes the unit price, total price, and repair turnaround time (RTAT). • The contractor must perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. • The contractor must comply with all applicable documents, including military specifications and standards. • The contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Aryel A. Ryan(Procurement Contracting Officer)

[email protected]

(717) 605-4614

Key dates

Opened
8/6/2026
Closes
9/21/2026
Duration
53 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
334412
Solicitation №
N0010426QDB44

Budget estimate

$50,000 – $500,000

The budget for this opportunity is difficult to estimate without more information about the scope of work and the number of circuit card assemblies to be repaired. However, based on the fact that the repair turnaround time is 53 days, it is likely that the contractor will be paid on a per-unit basis. Assuming an average cost of $1,000 per unit, and considering that the contractor may need to invest in equipment and personnel to perform the repairs, a rough estimate for the budget could be between $50,000 and $500,000. This estimate is highly speculative and should be taken as a rough order of magnitude.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Arizona

Top match · 87%

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/18/2026Opened 8/20/2026

U.S. Department Of Defense·United States of America

87% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

85% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 8/22/2026

U.S. Department Of Defense·United States of America

85% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

85% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 1/29/2027Opened 10/27/2026

U.S. Department Of Defense·United States of America

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 1/29/2027Opened 10/1/2026

U.S. Department Of Defense·Pennsylvania

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/18/2026Opened 8/20/2026

U.S. Department Of Defense·United States of America

84% match

49--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 2/2/2027Opened 9/17/2026

U.S. Department Of Defense·United States of America

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/15/2026Opened 9/30/2026

U.S. Department Of Defense·Virginia

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 1/11/2027Opened 10/28/2026

U.S. Department Of Defense·Virginia

84% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

83% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Defense·United States of America

83% match

CIRCUIT CARD ASSEMB

Closes 11/30/2026Opened 10/21/2026

U.S. Department Of Defense·Arizona

83% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

83% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/29/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

83% match

CIRCUIT CARD ASSEMB

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

82% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 1/29/2027Opened 9/24/2026

U.S. Department Of Defense·Pennsylvania

82% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/1/2026

U.S. Department Of Defense·Missouri

82% match

59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Closes 2/2/2027Opened 9/17/2026

U.S. Department Of Defense·United States of America

82% match

CIRCUIT CARD ASSEMB

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

82% match

CIRCUIT CARD ASSEMB

Closes 11/30/2026Opened 10/21/2026

U.S. Department Of Defense·Pennsylvania

82% match

CIRCUIT CARD ASSEMB

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

82% match

CIRCUIT CARD ASSEMB

Closes 11/27/2026Opened 10/21/2026

U.S. Department Of Defense·Pennsylvania

81% match

CIRCUIT CARD ASSEMB

Closes 11/2/2026Opened 10/1/2026