Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›Concrete Improvements

City Of Northglenn·Colorado

Concrete Improvements

Closes 6/9/2026$1M – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Northglenn is soliciting bids to replace concrete pavement on three lanes, install a modified curb‑and‑gutter system, and coordinate traffic control while complying with Colorado Department of Transportation (CDOT) concrete mix‑design standards. The work includes demolition of existing pavement, placement of a Class 6 aggregate base, concrete paving, installation of doweled expansion joints, and a special curb‑and‑gutter type with a 7‑inch face height. The contractor must submit a Traffic Control Plan, use approved delivery methods that avoid the Greenway Trails, and acknowledge receipt of the addenda. • Replace concrete pavement across three lanes with CDOT‑approved mix designs. • Install doweled expansion joints and a “Special” curb‑and‑gutter (Type 2) with a 7‑inch face height per CDOT standards. • Provide traffic‑control services to keep one lane open in each direction on Huron St and 112th Ave; submit plan for City approval. • Coordinate concrete delivery using alternate methods (pump trucks, conveyors, motorized buggies) because trucks cannot use Greenway Trails. • Incorporate the latest technical clarifications from Addendum 2 (June 3 2026) into cost estimates.

Attached files

Key dates

Opened
5/26/2026
Closes
6/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB 2026-005

Budget estimate

$1,000,000 – $2,000,000

No explicit contract value is provided. Based on the quantities (e.g., ~970 SY of sidewalk removal and replacement, ~120 CY of aggregate, multiple lane‑wide pavement sections) and typical municipal concrete rates ($10‑$15 per square foot for pavement, $50‑$80 per linear foot for curb‑and‑gutter), the total project cost is likely in the $1 million to $2 million range. This estimate assumes standard CDOT mix‑design costs, traffic‑control fees, and the added expense of alternative delivery methods.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Vista·California

Top match · 70%

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

City of Madison·Mississippi

70% match

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

City of Pueblo·Colorado

69% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026

City of Fort Wayne·Indiana

69% match

0963C - Five Points Neighborhood Concrete Repairs

Closes 11/12/2026Opened 10/29/2026

Central Arkansas Water·Arkansas

69% match

Annual Concrete Surface Repairs – 2027 (30 Day Option)

Closes 11/17/2026Opened 10/18/2026

City of Aberdeen·South Dakota

68% match

Award for 2026 Street Maintenance Concrete Repair II

Rolling / TBD closeOpened 8/25/2026

Niagara Frontier Transit Authority (NFTA)·New York

68% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

City of Denton·Texas

68% match

Concrete Repair and Installation Services

Closes 11/18/2026Opened 10/13/2026

City of Irving·Texas

68% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

North Carolina City of Raleigh·North Carolina

68% match

Small Concrete Repairs

Closes 11/4/2026Opened 10/22/2026

City of Fort Wayne·Indiana

68% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Culver City·California

68% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Fond du Lac·Wisconsin

68% match

MIXED LIQUOR SPLITTER STRUCTURE IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

City of Riverside·California

68% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Denton·Texas

67% match

Concrete Repair and Installation Services

Closes 11/18/2026Opened 10/13/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

Marlboro County·South Carolina

67% match

CONCRETE PAD AND SOIL IMPROVEMENT PROJECT

Closes 12/1/2026Opened 10/23/2026

City of Vernon·California

67% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

St. John the Baptist Parish Government·Louisiana

67% match

Bid 2026.22 Concrete Maintenance

Closes 11/17/2026Opened 10/21/2026

Central Arkansas Water·Arkansas

66% match

Annual Concrete Surface Repairs – 2027 (15 Day Option)

Closes 11/10/2026Opened 10/18/2026

City of Charlotte·North Carolina

66% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Georgia City of College Park·Georgia

66% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Mobile·Alabama

66% match

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

City of Little Rock·Arkansas

66% match

2027 Concrete Median Maintenance - ITB

Closes 11/12/2026Opened 10/25/2026