The University of Louisville is seeking a contractor to supply, install, operate, maintain, and later dismantle a double‑car buckhoist for the new Health Sciences Building (BP‑6). The scope includes providing a 5,000 lb‑per‑car capacity hoist system, all required engineering, permitting, training, and maintenance services for an anticipated service period of August 2027 through July 2028. The contractor must also handle installation logistics, provide drop‑test capability, and deliver a lump‑sum price covering overhead, profit, and detailed labor rates.
• Provide a double‑car buckhoist (5,000 lb capacity per car) with enclosed cab, heating, lighting, communications, and safety sensors.
• Supply all engineering, permitting, installation, training (initial and 4‑month follow‑up), maintenance (Fri/Sat), and dismantling services, including patch‑and‑repair of structural anchor points.
• Submit a single lump‑sum proposal by August 25, 2026, including safety performance metrics (EMR, TRIR, OSHA logs) and sign Messer’s Rental Division Standards Contract.