The Palm Beach County Water Utilities Department is soliciting bids for the construction of the South County Reclaimed Water Transmission Pipeline Phase 2 and the Lyons Road Force Main between Yamato Road and L-38. The project involves the construction of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe (DIP) via open cut and 7,731 linear feet of 30-inch High Density Polyethylene (HDPE) pipe via Horizontal Directional Drill (HDD). The project also includes the construction of 114 linear feet through the Jack and Bore construction. The proposed improvements for the South County Force Main Pipeline consist of the construction of approximately 1,555 linear feet of 36-inch and 7 linear feet of 16-inch Ductile Iron Pipe (DIP) and 7 linear feet of Ductile Iron Pipe (DIP) via open cut. Additionally, there will be 9,210 linear feet of 36-inch High Density Polyethylene (HDPE) pipe via Horizontal Directional Drill (HDD).
• The contractor shall provide all necessary labor, materials, and equipment to complete the project.
• The contractor shall comply with all applicable federal, state, and local safety regulations, laws, and standards.
• The contractor shall provide a traffic control plan and maintain safe access to the site for pedestrians and vehicles.
• The contractor shall protect existing facilities and utilities from damage during construction.
The project requires the contractor to provide a detailed outage plan and schedule for construction activities that will affect existing facilities. The contractor shall also provide temporary facilities and piping to minimize interference with the owner's operations and maintenance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.