Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›ITB 26-105 Lake Hearn Drive Sidepath Construction Project

Georgia City of Brookhaven·Georgia

ITB 26-105 Lake Hearn Drive Sidepath Construction Project

Closes 4/3/2026$250k – $400kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Brookhaven is seeking bids for the Lake Hearn Drive Sidepath Construction Project. The project involves removing approximately 450 linear feet of existing sidewalk and replacing it with an 8-foot wide multiuse sidepath. The work includes demolition, removal, hauling, and disposal of the existing concrete sidewalk, as well as coordination with Georgia Power to move decorative pedestrian street lights. The project also includes grading, compaction, forming, and pouring a new concrete multiuse sidepath, and restoring and installing new sod. Minor repairs to existing curb, gutter, and concrete ADA compliant handicap ramps may be required. Key aspects of the project include: • Removal and replacement of existing sidewalk • Coordination with Georgia Power to move street lights • Grading, compaction, and pouring of new concrete sidepath • Restoration and installation of new sod • Minor repairs to existing curb, gutter, and handicap ramps

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tron Jones(Buyer Contact)

[email protected]

(404) 637-0480

Key dates

Opened
3/10/2026
Pre-bid meeting
3/24/2026Mandatory
Closes
4/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE-64496-NONST-2026-000000046

Budget estimate

$250,000 – $400,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves removing and replacing approximately 450 linear feet of sidewalk, which would require a significant amount of labor, materials, and equipment. The cost of the project would depend on various factors such as the cost of labor, materials, and equipment, as well as any unexpected expenses or changes to the project scope. Based on industry standards, the cost of a similar project could range from $200,000 to $500,000. Therefore, a reasonable estimate for the budget of this project would be between $250,000 and $400,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cincinnati·Ohio

Top match · 69%

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

68% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

City of Hampton·Virginia

68% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Town of Bluffton·South Carolina

67% match

Holly Hill Lane Road Extension IFB

Closes 11/24/2026Opened 10/21/2026

Iowa City·Iowa

67% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Cincinnati·Ohio

67% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Minnesota Department of Transportation·Minnesota

67% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Missouri Department of Transportation·Missouri

67% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

Camden County·New Jersey

66% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Monterey·California

66% match

VETERANS PARK BIKE PATH, SEGMENT 4 PROJECT (NCP2435)

Closes 12/8/2026Opened 10/26/2026

Lake County, CA·California

66% match

South Main Street and Soda Bay Rd Widening and Bike Lanes Project

Closes 11/30/2026Opened 10/31/2026

County of Fairfax·Virginia

66% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

Idaho Transportation Department·Idaho

66% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

Massachusetts Town of Nantucket·Massachusetts

66% match

IFB - Sparks Avenue Sidepath Improvements Project

Closes 11/19/2026Opened 10/20/2026

City of Shawnee·Kansas

66% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

Washington County, WI·Wisconsin

66% match

Glacier Hills Co Park Friess Lake Access Project

Closes 11/5/2026Opened 10/7/2026

City of Elk Grove·California

66% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Charleston County·South Carolina

65% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Goshen, Indiana·Indiana

65% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

City of Lake City and City of Bellechester·Minnesota

65% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026