The California Department of Corrections and Rehabilitation (CDCR) is seeking a qualified contractor to install approximately 2,300 sq ft of seamless vinyl flooring at the San Quentin Rehabilitation Center visitor area under the Correctional Construction Mentorship (CCM) program. The contractor must provide all labor, materials, equipment, licenses, insurance, bonds, and related expenses, and must comply with detailed technical specifications, VOC limits, fire‑rating requirements, and a mandatory on‑site walk‑through. The contract is a short‑term, 90‑day public‑works agreement with a state‑estimated value of $35,500, and includes small‑business and DVBE preference incentives.
• Install seamless sheet‑vinyl flooring, cove base, and accessories per CDCR specifications (temperature control, moisture testing, mock‑up approval).
• Submit required submittals (shop drawings, product data, samples) and obtain manufacturer certification before installation.
• Provide payment and performance bonds, meet insurance minimums, and adhere to monthly‑in‑arrears payment schedule; offer at least a 1 % early‑payment discount.
• Mandatory site walk‑through on April 1, 2026; questions due April 3; bid submission due April 14, 2026.