Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • West Virginia guideWest Virginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›West Virginia
  4. ›Construction
  5. ›Replace 4,000 ties on SBVR and gage installed tie

West Virginia Purchasing Division·West Virginia

Replace 4,000 ties on SBVR and gage installed tie

Closes 9/17/2026$2.5M – $4MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The West Virginia State Rail Authority (via the Purchasing Division) is seeking qualified contractors to replace approximately 4,000 railroad crossties and perform associated track surfacing on the South Branch Valley Railroad (SBVR) between mileposts 43.0 and 51.0. The work includes removal and disposal of existing ties, supply and installation of new Grade 5 hardwood ties (80% 7"x9", 20% 7"x8"), new spikes, tie plugs, re‑spiking to a 56½‑inch gauge, rail anchor re‑application, ballast regulation, and production tamping. Contractors must have completed at least five similar railroad track projects and must coordinate schedules with SBVR to avoid interference with daily freight and weekend excursion trains. All materials must meet AREMA specifications, and the contractor is responsible for permits, site access, final cleanup, and warranty documentation. • Replace 4,000 crossties (Grade 5 hardwood, mixed oak/softwood) • Provide and install new spikes, tie plugs, and rail anchors • Perform track surfacing, ballast regulation, and production tamping (minimum 30‑day gap after tie installation) • Coordinate with SBVR for train schedule interruptions (freight weekdays, excursion weekends) • Remove and dispose of old ties, debris, and spikes; old spikes remain SRA property • Must hold permits, follow AREMA standards, and submit warranty paperwork at final inspection.

Attached files

Contact

John W Estep(Buyer)

[email protected]

(304) 558-2566

Key dates

Opened
8/18/2026
Closes
9/17/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
488210
Solicitation №
CRFQ-0810-DMT2700000001-1

Budget estimate

$2,500,000 – $4,000,000

Based on typical industry costs for railroad tie replacement (approximately $500‑$800 per tie including material, labor, and disposal) plus additional surfacing, ballast regulation, and tamping, the total contract value is estimated between $2.5 million and $4 million. The lower bound assumes $600 per tie ($2.4 M) plus $0.1 M for ancillary work; the upper bound assumes $800 per tie ($3.2 M) plus $0.8 M for extensive surfacing and tamping. Project size, material specifications (Grade 5 hardwood ties), and coordination with SBVR train schedules are key cost drivers.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Illinois

Top match · 61%

Go/No-Go Thread Gages (SBG-625 & SBG-626)

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

61% match

25--TIE ROD,STEERING

Closes 11/1/2026Opened 10/21/2026

NYS MTA - Metro-North Railroad·New York

59% match

1-Year Rolled Tie Plates

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

59% match

59--WIRING HARNESS

Closes 11/8/2026Opened 9/25/2026

U.S. Department Of Defense·Michigan

59% match

New Lock Stoplogs

Closes 11/4/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

58% match

Wiring Harness, Branched

Closes 11/20/2026Opened 10/6/2026

U.S. Department Of Defense·Alabama

58% match

Synopsis Wiring Harness , Branched

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

61--WIRING HARNESS,BRANCHE

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

58% match

61--WIRING HARNESS,BRANCHE

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

58% match

59--WIRING HARNESS,BRANCHE

Closes 11/1/2026Opened 10/25/2026

City of Charlotte·North Carolina

57% match

Train Control Grade Crossing Spare Parts Contract

Rolling / TBD closeOpened 4/1/2026

U.S. Department Of Defense·United States of America

57% match

59--CONNECTOR-SWITCH ASSEM

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Pennsylvania

57% match

CONNECTOR ASSEMBLY,

Closes 11/30/2026Opened 9/29/2026

U.S. Department Of Defense·Florida

57% match

15--SERVOVALVE,CLUTCH, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

Education, NYS Dept. of·New York

57% match

NYSSD Electrical Panel Replacement

Closes 11/3/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

57% match

53--RIVET,SOLID

Closes 11/9/2026Opened 10/27/2026

City of Grand Forks·North Dakota

57% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

57% match

CONNECTOR ASSEMBLY,

Closes 11/30/2026Opened 9/29/2026

U.S. Department Of Defense·Illinois

57% match

Strut arm ring springs and suitable surface and filler lubricants Jerry F. Costello Lock and Dam W912P9

Closes 11/6/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

57% match

61--WIRING HARNESS,BRAN

Closes 11/1/2026Opened 10/25/2026

Massachusetts Bay Transportation Authority·Massachusetts

57% match

IFB 132-26 Widett Layover Facility - Timber Tie Turnouts

Closes 11/3/2026Opened 10/6/2026

Southern California Regional Rail Authority·California

57% match

Track Concrete Fastening OTM

Closes 12/1/2026Opened 10/19/2026