The Boone County Fiscal Court is seeking bids from qualified contractors to provide labor, equipment, materials, traffic control, restoration, and incidentals necessary for the removal and replacement of damaged concrete curb, sidewalk, and ADA-compliant pedestrian ramps at various streets in Triple Crown Subdivision. The project includes the replacement of 30-inch concrete curb, sidewalk replacement, and ADA ramp installation. The contractor will be responsible for providing all necessary labor, supervision, materials, tools, equipment, traffic control, disposal, restoration, and incidentals to complete the work. The project must be completed by May 1, 2027.
• The contractor must comply with all applicable federal, state, and local laws and regulations.
• The contractor must provide insurance coverage as specified in the solicitation document.
• The contractor must provide a bid sheet, deviations and exceptions, W9 form, certificate of insurance, and other required documents.
• The contractor must certify that they are authorized to sign the bid and that the bid is not the result of collusion or fraud.