Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›FAN ASSEMBLY

U.S. Department Of Defense·Pennsylvania

FAN ASSEMBLY

Closes 8/7/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Navy is seeking a contractor to repair FAN ASSEMBLY. The contractor must meet the operational and functional requirements as represented by the Cage Code and reference number. The repair work shall be performed in accordance with the contractor's repair/overhaul standard practices, manuals, and directives. The contractor is responsible for the performance of all inspection requirements as specified in the contract. Key points to consider: • The contractor must provide a quote that includes the repair price with all costs associated with receipt and complete repair of the material. • The contractor must meet the Government's Required Repair Turnaround Time (RTAT) of 125 days. • The contractor must perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. • The contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. • The contractor must furnish a drawing and an explanation of the reason for any changes in design, material, servicing, or part number.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dakota S. Bentzel(Procurement Contracting Officer)

[email protected]

(717) 605-2828

Key dates

Opened
7/8/2026
Closes
8/7/2026
Duration
125 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
333413
Solicitation №
N0010426QJB74

Budget estimate

$100,000 – $500,000

The budget for this opportunity is difficult to estimate, as the document does not provide a specific dollar amount. However, based on the complexity of the repair work and the Required Repair Turnaround Time, it is likely that the budget will be in the range of $100,000 to $500,000. The budget will depend on the contractor's ability to meet the Government's requirements, including the RTAT and the quality of the repair work. Factors that may influence the likely payment range include the cost of materials, labor, and overhead, as well as the level of competition for the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 67%

FAN,TUBEAXIAL

Closes 11/25/2026Opened 10/28/2026

Texas Department of Public Safety·Texas

66% match

Facility Industrial Fan

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

66% match

16--EVAPORATOR FAN,AIRC, IN REPAIR/MODIFICATION OF

Closes 11/18/2026Opened 8/20/2026

U.S. Department Of Defense·United States of America

65% match

41--FAN ASSEMBLY,CENTRIFUG

Closes 11/8/2026Opened 10/27/2026

Sutton Housing Authority·Massachusetts

65% match

Bathroom Fan Installation

Closes 11/6/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

64% match

41--FAN ASSEMBLY,CENTRIFUG

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

64% match

New Manufactured Material, NSN 2840-01-533-0151 PR (AMC 3V)

Closes 12/2/2026Opened 10/16/2026

East Bridgewater Housing Authority·Massachusetts

63% match

SUST - Bath Fan Installation

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Defense·Michigan

63% match

Sources Sought, Vaneaxial Fan Assembly, NSN: 4140-01-284-5722

Closes 11/2/2026Opened 10/22/2026

U.S. Department Of Defense·Pennsylvania

63% match

16--VANEXIAL FAN,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 12/3/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

63% match

16--EVAPORATOR FAN,AIRC, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Defense·United States of America

62% match

41--FAN,VANEAXIAL

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

20--COOLER ASSEMBLY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

28--BLADE SET,FAN,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/13/2026Opened 10/21/2026

Northcentral Technical College·Wisconsin

62% match

Air Handler Fan Wall Upgrade - Buildings F & G, Wausau Campus

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Defense·Ohio

62% match

F110 ROTOR FAN AIRCRAFT, NSN: 2840-01-580-7062PR, PN: 9547M28G15

Closes 12/14/2026Opened 10/26/2026

Louisiana Grambling State University·Louisiana

61% match

(50) HEAT PUMP FAN COIL UNITS

Closes 11/5/2026Opened 10/15/2026

The University of North Carolina·North Carolina

61% match

Jordan Hall HVAC Renovations

Closes 12/3/2026Opened 1/3/2025

U.S. Department Of Defense·Oklahoma

61% match

BLADE,COMPRESSOR,AI

Closes 11/4/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

61% match

FD2030-26-01255

Closes 3/5/2027Opened 3/5/2026

U.S. Department Of Defense·United States of America

61% match

16--DUCT ASSEMBLY,AIR COND

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

61% match

41--FAN,CENTRIFUGAL

Closes 11/8/2026Opened 10/28/2026