The Army is conducting market research (Sources‑Sought/RFI) for the build‑to‑print manufacture, assembly, first‑article inspection, testing, and delivery of four ruggedized Power Distribution and Illumination Systems (PDISE) items. The effort will use existing Government Technical Data Packages and MIL‑DTL‑53126 specifications, requiring capabilities in heavy‑gauge cable assembly, Class L connector integration, CARC coating, military packaging, and the ability to conduct First‑Article Testing within 180–360 days after award. Respondents must supply corporate information, capability statements, past performance, manufacturing readiness level, supply‑chain lead‑times, surge capacity, and ROM pricing by quantity.
• Items: M200 (200 A), M100 (100 A), M40 (40 A) feeder/distribution systems and M46 utility assembly.
• Required capabilities: Build‑to‑print production, in‑house or subcontracted FAT, ISO 9001/AS9100 certification, configuration management, and DPAS surge capacity.
• Deliverables: Detailed questionnaire responses (≤20 pages body) submitted by 06 Nov 2026, including ROM unit‑costs for 1‑50, 51‑100, and 101‑200 units.