The City of Findlay is soliciting bids for the design‑build construction of a new ADA‑compliant restroom facility in Brucklacher Park. The scope includes site preparation, utility installation, a 506 SF restroom building, mechanical, electrical, and plumbing systems, as well as required finishes and accessories. Bidders must submit a bid bond (10 % cash or 100 % guarantee) and a performance bond (100 % of contract price), comply with prevailing‑wage requirements, and provide required certifications.
• Construct a single‑story, 506 SF ADA restroom building with concrete foundation, metal roofing, and fiber‑cement siding.
• Provide all MEP work, including a 1 ¼″ PVC sanitary sewer forcemain, a 4″ sidewalk, a grinder pump system, and utility connections.
• Include interior finishes (sealed concrete flooring, paint, fixtures, grab bars), site improvements (grading, curbing, parking, bike‑rack pad), and required documentation (bond, insurance, non‑collusion affidavit).