The City of Cedar Hill, TX is seeking bids for the reconstruction of Summit Place and Robin Road. The project includes furnishing all labor, tools, material, and equipment, and performing all work necessary for reconstruction of pier, soil anchor, gabion structures, water, drainage, and asphalt pavement. The work includes the installation of 675 VF 30” Cased Piers, 125 CY Reinforced Concrete Beams, Soil Anchors, 515 CY gabions, 600 LF 8” PVC water line, 900 SY subgrade /Asphalt Pvmt, 140 LF HP drainage Pipe, 350 SY concrete flume, and any other work deemed necessary by the City of Cedar Hill.
• The project will be done in accordance with NCTCOG specifications, with the City of Cedar Hill’s Addenda and as per instructions of the OWNER.
• All construction sequencing and barricading will be done according to the City of Cedar Hill Standards and Details and TxDOT’s Manual for Uniform Traffic Control Devices (MUTCD), unless work occurs within TxDOT ROW, in which case TxDOT standards will apply.
• A non-mandatory pre-bid teleconference meeting will be held on June 2, 2026, at 2:00 p.m. via Zoom Video Communications.