This solicitation seeks a qualified contractor to reconfigure bathroom spaces across four buildings (1, 4, 6, 7) at the Elmira Psychiatric Center. The work includes demolition of existing fixtures, installation of new plumbing, HVAC, electrical, fire‑protection, and finish systems, and ensuring full compliance with NYS building, plumbing, fire, and accessibility codes. The contractor must coordinate multiple trades, submit as‑built documentation, and meet the bid deadline of late July 2026.
• Demolition, removal of existing bathroom fixtures and finishes, and disposal of hazardous materials.
• Installation of new plumbing (water closets, lavatories, urinals, fire‑sprinkler systems) and HVAC components (exhaust grilles, ductwork, control valves).
• Electrical upgrades (LED lighting, occupancy sensors, fire‑alarm devices) and fire‑protection upgrades (ligature‑resistant sprinkler heads, fire‑stop seals).
• Coordination with the building‑automation engineer (Day Automation) and fire‑alarm vendor (Johnson Controls) for system integration.
• Compliance with NYS Building Code 2020, NYS Plumbing Code 2020, NYS Fire Code 2020, ADA accessibility standards, and all relevant safety regulations.