Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Quotes 2026-66SD Mini Splits

City of Holyoke, MA·Massachusetts

Quotes 2026-66SD Mini Splits

Closes 7/21/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Request for Quotes 2026-66SD 1. Replace 2-ton and 4-ton split system – Central Supply • The Holyoke School Department is soliciting quotes for the removal and replacement of the existing 2-ton and 4-ton split system that serves the Facilities Director's offices and IT Department offices, Central Supply, 728 Main Street, 3rd Floor, Holyoke, MA 01040. Remove and replace the existing 2-ton and 4-ton split system HVAC units. Scope includes installation of new gas furnaces, matching cased evaporator coils, and outdoor condensing units. The new condensing units shall be relocated to the indoor warehouse area as specified, including full repiping of refrigerant lines to accommodate the new layout. Refrigeration piping will be properly supported, insulated, and installed in accordance with manufacturer specifications and industry standards. Scope also includes installation of new electrical components and wiring to serve both condensing units, ensuring all electrical work complies with applicable codes. Gas piping shall be modified and repiped as required to properly serve the new furnace equipment, including all necessary fittings, isolation valves, and leak testing. ● Documents will be available electronically starting July 1st, 10:00 am, at [email protected] ● Electronic submissions will be accepted at [email protected] no later than July 21st, 2:30 pm. • Non-Mandatory but highly recommended, a pre-bid walkthrough will be held on July 10th at 2:00 pm. Meet at the front door of 728 Main Street, then we will head upstairs to the 3rd floor. All work is expected to be neat, clean, and in a professional workman-like manner. The job site will be left clean and free of debris generated from this project. Any dust and/or debris must be cleaned, and there will be no exceptions.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
7/1/2021
Closes
7/21/2026

Last updated

Details

Industry
Construction
NAICS
238220

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 63%

16--DUAL BREAKAWAY,AUX

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

47--COUPLING HALF,QUICK

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

63% match

47--COUPLING HALF,QUICK DI

Closes 11/8/2026Opened 10/28/2026

Department of Behavioral Health and Developmental Disabilities·South Carolina

63% match

REQUEST FOR QUOTE - 2 Mini Split Units

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·California

63% match

47--COUPLING HALF,SELF-SEA

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

63% match

73--Equipment IST - FTRD

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

62% match

66--TEST SET,INTERFACE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

66--TRANSDUCER,MOTIONAL PI

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

66--BEAM SPLITTER,OPTICAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

61% match

47--COUPLING HALF,QUICK DI

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

59--SWITCH,REED

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

66--INDICATOR,DIGITAL DISP

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

61% match

16--BRACKET ASSEMBLY,MICRO

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

61% match

47--COUPLING HALF,QUICK DI

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·California

61% match

47--COUPLING HALF,QUICK DI

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

47--COUPLING HALF,QUICK DI

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

25--BRAKE,SHOE TYPE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

66--PANEL,CONTROL,ELECTRIC

Closes 11/3/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

61% match

62--LIGHT,INDICATOR

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

61--STARTER,MOTOR

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·California

61% match

17--PARTS KIT,HOLDBACK

Closes 11/4/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

61% match

59--SWITCH,ROTARY

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

61% match

25--PARTS KIT,WINDSHIELD

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

61% match

59--RELAY,SOLID STATE

Closes 11/2/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

60% match

53--SPRING,HELICAL,COMPRES

Closes 11/9/2026Opened 10/26/2026