Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›Design Build Services (DBS) for Scott Candler Water…

County of DeKalb, GA·Georgia

Design Build Services (DBS) for Scott Candler Water Treatment Plant Demolition and New Clearwells and High Service Pump Station

Closes 3/5/2026$20M – $50MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of DeKalb, GA, is seeking design-build services for the Scott Candler Water Treatment Plant Demolition and New Clearwells and High Service Pump Station project. The project involves demolishing the existing old filter plant, constructing a new high service pump station, and adding two new 10 million gallons of Clearwell water storage, with space for an additional 20 million gallons in the future. The design-builder will be responsible for performing all surveys and reports needed for design and construction decisions, coordinating service tie-ins, preparing drawings and specifications, and obtaining necessary permits. The project will be completed in two phases: Phase 1 includes design and preconstruction services, and Phase 2 includes final design and construction services. Key considerations include minimizing life-cycle costs, achieving an optimal balance of risk allocation, and implementing an effective safety program. • The project requires experience in design, permitting, construction, and commissioning. • The design-builder must comply with all local, state, and federal regulations. • The project involves multiple stakeholders, including the County, designers, contractors, and subcontractors. • The design-builder must provide a detailed project schedule, including milestones and deadlines. • The project requires coordination with ongoing operations and maintenance staff. • The design-builder must provide a quality control plan and a construction safety program. • The project involves significant environmental considerations, including protecting existing infrastructure and minimizing risks during demolition and construction.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Denise Badillo(Procurement Agent)

[email protected]

(843) 822-1062

Key dates

Opened
10/27/2025
Questions due
1/23/2026
Pre-bid meeting
11/13/2025Mandatory
Site visit
11/13/2025
Closes
3/5/2026
Duration
1095 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
2025-117-RFP

Budget estimate

$20,000,000 – $50,000,000

Based on the scope of work, which includes demolition, construction of new clearwells and a high service pump station, and the addition of significant water storage capacity, the estimated budget for this project could range from $20 million to $50 million. This estimate takes into account the complexity of the project, the need for specialized engineering and construction services, and the costs associated with environmental mitigation and regulatory compliance. Factors influencing this estimate include the scale of the project, the materials and labor required, and the potential for unforeseen site conditions or regulatory hurdles.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Johnson County Wastewater·Kansas

Top match · 76%

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Fort Pierce Utilities Authority·Florida

75% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Sun 'n Lake Improvement District·Florida

74% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

City of Kyle·Texas

74% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

Oregon City of Ashland·Oregon

74% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

73% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

City of Ashland·Oregon

73% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Cincinnati·Ohio

73% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Contra Costa Water District·California

72% match

Bollman Water Treatment Plant Improvements

Closes 12/10/2026Opened 10/29/2026

City of Eureka Springs·Arkansas

72% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Holly Grove·Arkansas

72% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Thornton·Colorado

72% match

3MG Clearwell #3

Closes 11/18/2026Opened 6/19/2025

Metropolitan Sewer District of Greater Cincinnati·Ohio

72% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

Charles County Government·Maryland

72% match

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Closes 11/9/2026Opened 7/8/2026

Town of Queen Creek·Arizona

72% match

Design/Build - Industrial Wastewater Treatment Facility

Closes 12/8/2026Opened 10/22/2026

Western Municipal Water District·California

72% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Health And Human Services·South Dakota

72% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

72% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

Texas City of Huntsville·Texas

72% match

NO. 27-06 NB Davidson WWTP

Closes 12/17/2026Opened 10/21/2026

City of Fresno·California

72% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

72% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

72% match

TDCJ - Water Treatment Plant for Memorial

Closes 11/23/2026Opened 10/7/2026

The Metropolitan Water District of Southern California·California

71% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

NYS Dutchess County Water and Wastewater Authority·New York

71% match

Quaker Hill-Hyde Park Interconnect-Water Main & Pump Station

Closes 11/25/2026Opened 10/20/2026

Massachusetts Auburn Water District Inactive·Massachusetts

71% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026