Description
The City of Centerton is seeking qualified contractors to construct a multi‑use concrete trail, modify existing sanitary‑sewer manholes, install reinforced concrete pipe, install fencing, and perform related excavation, grading, and site‑stabilization work for Phase 2 of the McKissic Creek Park Trail and Allen Road Trail project. The work begins at the northern end of the existing trail near the McKissic Creek bridge and extends to the southwest corner of Allen Road and Town Vue Road, with an additional side trail connecting to Kate Drive. Bids must be sealed, include a 5 % bid bond, and be submitted by June 24, 2026. A non‑mandatory virtual pre‑bid conference is scheduled for June 2, 2026, and questions are due by June 10, 2026. The contract is subject to federal labor and Buy‑America requirements, and contractors must be registered in SAM.
• Concrete multi‑use trail construction and related utility adjustments
• Installation of reinforced concrete pipe, flared ends, and fencing
• Excavation, grading, site stabilization, and ancillary work throughout the corridor
• Mandatory bid bond (5 % of bid) and SAM registration required
• Pre‑bid virtual conference on June 2 2026 (optional)
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
(479) 273-2209