Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›Bituminous Resurfacing of Hwy 2 (CSAH 2) from Reeves Road…

Lake County, MN·Minnesota

Bituminous Resurfacing of Hwy 2 (CSAH 2) from Reeves Road (UT 42) to Wales Road (CSAH 14) – Lake County, MN

Closes 5/7/2026$4M – $10MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks qualified contractors to perform a full-depth bituminous resurfacing of approximately 7.4 miles of County Highway 2 in Lake County, Minnesota, spanning from Reeves Road (UT 42) to Wales Road (CSAH 14). The work includes removal of existing signage, aggregate base and shoulder preparation, installation of new aggregate surfacing, bituminous patching, milling of existing surface, installation of rumble strips, traffic control devices, sign panels, pavement markings, and final line striping. The project is federally funded, requires DBE participation, and includes compliance with MnDOT specifications for foreign steel, non‑collusion, and responsible‑contractor certifications. Bidders must submit a proposal bond (5 % of bid total) and a detailed schedule of prices for each line item. • Location: Lake County, MN – Hwy 2 (CSAH 2) from Reeves Rd (UT 42) to Wales Rd (CSAH 14) • Scope: Removal of signs, aggregate base & shoulder prep, surfacing, milling, rumble strips, traffic control, sign installation, pavement marking, line striping • Key requirements: DBE goal, foreign‑iron/steel stipulation, non‑collusion affidavit, responsible‑contractor certification, 5 % bid bond, detailed price schedule

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
4/2/2026
Questions due
5/4/2026
Closes
5/7/2026
Duration
6 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
SP 038-602-035

Budget estimate

$4,000,000 – $10,000,000

The solicitation does not disclose a total contract value. Based on the quantities (≈2,500 CY of aggregate surfacing, 120 TON of bituminous mixture, extensive milling, signage, and line‑striping) and typical MnDOT resurfacing rates (~$2‑$4 million per mile for full‑depth bituminous work), a reasonable estimate for the full project lies between $4 million and $10 million. The lower bound reflects minimal unit‑price bids; the upper bound assumes higher material and labor rates, plus DBE and compliance costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Minnesota Department of Transportation·Minnesota

Top match · 77%

260145 SP 4208-68

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

76% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

76% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

74% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

Clay County·Florida

74% match

County Road 220 Phase 2 – Milling and Resurfacing

Closes 11/30/2026Opened 10/15/2026

Minnesota Department of Transportation·Minnesota

74% match

260134 SP 6222-196

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

73% match

Grading, Concrete & Bituminous Surfacing, Lighting, and Bridge No.s 53827‑53830

Closes 11/4/2026Opened 10/16/2026

Jackson County Board of County Commissioners·Florida

72% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

City of Toledo·Ohio

71% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

Minnesota Department of Transportation·Minnesota

71% match

260151 SP 2787-31

Closes 11/18/2026Opened 10/21/2026

York County·South Carolina

71% match

Asphalt Resurfacing for Solid Waste Convenience Center

Closes 11/4/2026Opened 10/8/2026

Bay County, FL·Florida

70% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Lake County, CA·California

70% match

South Main Street and Soda Bay Rd Widening and Bike Lanes Project

Closes 11/30/2026Opened 10/31/2026

Lapeer County Road Commission·Michigan

70% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

Clermont County - Board of Commissioners·Ohio

70% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026