The City of Rochester, NH is seeking a qualified contractor to replace the existing Ryan Circle wastewater pump station with a new, fully‑equipped facility. The scope includes demolition of existing structures, civil earthwork, concrete foundations, installation of new wet‑well, pumps, VFDs, standby generator, electrical distribution, instrumentation, and site improvements, all funded through the Clean Water State Revolving Fund. The contract will be awarded to the lowest responsive and responsible bidder, with a substantial‑completion deadline of 365 days and final completion of 395 days from the Notice to Proceed.
• Demolition of the current pump station, utilities, and associated structures.
• Construction of a new pump‑station building, wet‑well, force‑main, two 20 HP pumps with VFDs, and a 60 kW standby diesel generator.
• Full electrical, control, and instrumentation systems (PLC, HMI, UPS) plus site grading, paving, and erosion‑control measures.
• Compliance with Buy‑America, AIS, Davis‑Bacon prevailing‑wage, DBE/MBE requirements, and all applicable state and federal codes.