Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Construction
  5. ›Tuxedo Lane Drainage Improvement Project (10/19 amended)

Georgia City of Peachtree City·Georgia

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026$200k – $400kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Peachtree City is soliciting sealed bids for the Tuxedo Lane & Smokerise Trace Drainage Improvements, a municipal storm‑water project. The work involves removing portions of an existing 30‑inch CMP storm‑water system, installing 825 linear feet of new 30‑inch reinforced concrete pipe (RCP), adding a drop inlet and five junction boxes, and performing associated site work such as asphalt cart‑path removal and replacement, trench patching, structural modifications, and crosswalk restriping. Bids must include a 5 % bid security, contractor qualifications, and required affidavits. The contract is locally funded, and the successful bidder will be required to post performance and payment bonds (100 % and 110 % of contract price, respectively). The project must be substantially completed within 60 calendar days of the Notice to Proceed, with final completion 30 days thereafter, and liquidated damages of $200 per day apply for delays. • Scope: 825 ft of 30‑in. RCP, drop inlet, 5 junction boxes, asphalt path removal/replacement, trench patching, structure modification, crosswalk restriping. • Mandatory pre‑bid conference on‑site: Oct 29, 2026 10:00 AM. • Bid opening: Nov 17, 2026 3:00 PM (sealed bids). • Required bonds: 5 % bid security, 100 % performance bond, 110 % payment bond. • Schedule: 60 days to substantial completion, additional 30 days to final completion. • Evaluation: Lowest responsive, responsible bid; City reserves right to reject all bids.

Attached files

Contact

Angela Egan(Buyer Contact)

[email protected]

(770) 486-4181

Key dates

Opened
10/15/2026
Pre-bid meeting
10/29/2026Mandatory
Closes
11/17/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE-65650-NONST-2027-000000044

Budget estimate

$200,000 – $400,000

Based on typical municipal storm‑water pipe installation rates in Georgia (approximately $200–$300 per linear foot for 30‑in. RCP plus ancillary work), the 825 ft of pipe alone suggests a base cost of $165,000–$247,500. Adding costs for the drop inlet, junction boxes, asphalt path removal/replacement, trench patching, structural modifications, and crosswalk restriping (estimated $30,000–$80,000) brings the total project value to roughly $200,000–$400,000. The estimate also accounts for required bonds, insurance, and contractor overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Peachtree City·Georgia

Top match · 98%

Tuxedo Lane Drainage Improvements (amended)

Closes 11/17/2026Opened 10/15/2026

Henry County·Georgia

87% match

(BID) 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

City of Charlotte·North Carolina

86% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

86% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

City of Charlotte·North Carolina

86% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Georgia Henry County Board of Commissioners·Georgia

86% match

BID, 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

City of Charlotte·North Carolina

85% match

Collective AJ Storm Drainage Improvement Projects

Rolling / TBD closeOpened 3/29/2026

Louisiana St. Tammany Parish Government·Louisiana

85% match

Ozone Park Subdivision Drainage

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

85% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

Maryland Baltimore City Department of Public Works·Maryland

85% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

85% match

Rocky Falls Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2028

Georgia City of Valdosta·Georgia

85% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Charlotte·North Carolina

85% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Shawnee·Kansas

85% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of South Miami·Florida

85% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

85% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

85% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Doge City·Kansas

85% match

Rattlesnake Drainage Improvements (closed 03/31/26)

Rolling / TBD closeOpened 3/13/2026

City of Charlotte·North Carolina

85% match

Severn/Tyndal Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/17/2026

City of Charlotte·North Carolina

85% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Valdosta·Georgia

84% match

Lakeland Avenue Drainage Improvements

Closes 12/1/2026Opened 8/27/2026

City of Oldsmar·Florida

84% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

City of Charlotte·North Carolina

84% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

84% match

Craighead/Tryon Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/14/2026

City of Charlotte·North Carolina

84% match

Collective Storm Drainage Improvement Project Series X

Rolling / TBD closeOpened 5/29/2026