The Portsmouth Naval Shipyard is requesting responses from sources capable of providing 100 HP (400 CFM) and 400 HP (1600 CFM) Low-Pressure Air Compressors (LPACs). The period of performance is from June 22, 2026, to August 16, 2026, with an option period from August 17, 2026, to September 13, 2026. The place of performance is Naval Base Point Loma, San Diego, CA.
• The contractor must provide LPACs that meet the specified requirements.
• The contractor must deliver the LPACs to the designated location within the specified timeframe.
• The contractor must provide documentation demonstrating their technical acceptability and experience with similar projects.
• The contractor must provide a price quote for the LPACs and any additional services required.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.