Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›FY26-CP-E07 OTC Connector Road

Georgia Bulloch County·Georgia

FY26-CP-E07 OTC Connector Road

Closes 11/6/2025$1M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for the construction of a two-lane connector road between Earl Dabbs Drive and U.S. 301 South. The project includes a right turn deceleration lane along US301 southbound within GDOT right-of-way. The contractor will be responsible for constructing the road, including grading, paving, and drainage. The project requires the contractor to verify all dimensions and existing conditions prior to starting work and to be responsible for the proper fit of all components. • The project consists of constructing a two-lane connector road between Earl Dabbs Drive and U.S. 301 South. • The contractor will be responsible for constructing the road, including grading, paving, and drainage. • The project requires the contractor to verify all dimensions and existing conditions prior to starting work and to be responsible for the proper fit of all components. • The contractor must ensure that the site is ADA accessible as required by federal, state, and local government. • The contractor must provide a geotextile fabric underlayment and a stormwater management system. • The project includes the installation of utilities, including water and sewer lines.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
10/23/2025
Questions due
10/31/2025
Closes
11/6/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
FY26-CP-E07

Budget estimate

$1,000,000 – $5,000,000

Based on the scope of work, which includes the construction of a two-lane connector road, the estimated budget could range from $1 million to $5 million. This estimate is rough and may vary depending on factors such as labor costs, material prices, and the complexity of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois Tollway·Illinois

Top match · 68%

I-25-4767 - Roadway & Bridge Construction

Closes 11/20/2026Opened 10/3/2026

Idaho Transportation Department·Idaho

67% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

67% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

66% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/12/2026Opened 10/29/2026

New Jersey Department of Transportation Procurement·New Jersey

66% match

Route 295/42/I‑76 Direct Connection – Construction Inspection Contract # 4

Closes 11/5/2026Opened 10/14/2026

U.S. Department Of Defense·Utah

66% match

FD2020-22-00590

Closes 2/28/2027Opened 3/1/2022

Virginia Department of Transportation·Virginia

65% match

B30_2027 ON-CALL BRIDGE MAINTENANCE

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

65% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

65% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/9/2026Opened 10/26/2026

Massachusetts Town of Barre·Massachusetts

65% match

FY27-06 Cutler Road Reconstruction

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

65% match

59--ADAPTER,CONNECTOR

Closes 11/12/2026Opened 10/29/2026

Illinois Tollway·Illinois

65% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

U.S. Department Of Defense·United States of America

65% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/2/2026Opened 10/19/2026

NYS Niagara County·New York

65% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Agency of Transportation - Contract Administration·Vermont

65% match

St. George-Williston STP PS26(7)

Closes 11/20/2026Opened 10/28/2026

California Department of Transportation·California

65% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

65% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/4/2026Opened 10/21/2026

Virginia Department of Transportation·Virginia

64% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Virginia Department of Transportation·Virginia

64% match

B35_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

64% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/3/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

64% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

64% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/2/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

64% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/2/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

64% match

59--CONNECTOR,RECEPTACLE,E

Closes 11/12/2026Opened 10/29/2026