Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›PURIFIER, CENTRIFUGAL

U.S. Department Of Homeland Security·California

PURIFIER, CENTRIFUGAL

Closes 3/17/2026$100k – $500kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Coast Guard Surface Forces Logistics Center is seeking a centrifugal purifier from the original equipment manufacturer (OEM), GEA Mechanical Equipment US, Inc., or their authorized distributors. The required item is a GEA Marine Separator 12 (OSF 12-91-162/10) with a feed pump and controls, and it must be packaged individually according to specific military standards. The package must include standard COTS documentation and warranty. • The item must be packaged in a wooden crate with cushioning materials, dunnage, blocking, and bracing to protect the item and restrict its movement within the container. • Each package must be marked according to military standards and bar-coded. • The package label must include the item name, part number, NSN, quantity, and contract number. • The solicitation is sole source, and only authorized distributors with the required capabilities can submit a quote. • The quote must include a letter from the OEM verifying the company's status as an authorized distributor.

Attached files

Contact

Carlos Diaz Garcia

[email protected]

(206) 827-4024

Key dates

Opened
3/12/2026
Closes
3/17/2026

Last updated

Details

Type
Sole Source
Industry
Manufacturing
NAICS
333310
Solicitation №
70Z08526N40071B00

Budget estimate

$100,000 – $500,000

The budget for this opportunity is difficult to estimate without more information about the specific requirements and the bidder's pricing. However, based on the fact that the solicitation is for a specialized piece of equipment, the budget could be in the range of $100,000 to $500,000. The estimate is influenced by the complexity of the item, the packaging requirements, and the need for the bidder to be an authorized distributor of the OEM.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 72%

49--PURIFIER,CENTRIFUGAL,O

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

68% match

PUMP UNIT,CENTRIFUG

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

67% match

43--IMPELLER,PUMP,CENTRIFU

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

41--FAN,CENTRIFUGAL

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

66% match

41--FAN,CENTRIFUGAL

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

66% match

PUMP, CENTRIFUGAL, COOLANT

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

66% match

43--PUMP,CENTRIFUGAL

Closes 11/26/2026Opened 10/21/2026

U.S. Department Of Defense·Maryland

66% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,CENTRIFUGAL

Closes 11/7/2026Opened 10/26/2026

U.S. Department Of Defense·Florida

65% match

43--PUMP,CENTRIFUGAL

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP UNIT,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·California

65% match

43--PUMP,CENTRIFUGAL

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

65% match

41--FAN ASSEMBLY,CENTRIFUG

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Florida

65% match

43--PUMP UNIT,CENTRIFUGAL

Closes 11/1/2026Opened 10/22/2026

Massachusetts City of Haverhill·Massachusetts

65% match

Centrifuge Conveyor Replacement at the Haverhill Wastewater Division Process Building

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

PUMP,CENTRIFUGAL

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

UCLA Capital Programs·California

64% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

64% match

PUMP UNIT,CENTRIFUG

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·California

64% match

41--FAN,CENTRIFUGAL

Closes 11/8/2026Opened 10/28/2026

County of Sacramento·California

63% match

Chiller Overhaul Maintenance Services

Closes 11/4/2026Opened 10/19/2026

University of Massachusetts·Massachusetts

63% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

63% match

43--PUMP,CENTRIFUGAL

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

63% match

43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·California

62% match

43--PUMP,CENTRIFUGAL

Closes 11/8/2026Opened 10/27/2026