The University of North Dakota is seeking bids to fully reconstruct a 0.6‑mile segment of North 25th Street on the UND campus, replacing existing pavement, curbs, gutters, sidewalks, and storm‑water utilities. The scope includes demolition, subgrade preparation, new concrete and asphalt pavement, curb‑and‑gutter installation, sidewalk work, utility relocation, street lighting, traffic‑control, erosion‑control, and landscaping (seeding and hydromulch). Bidders must submit a bid bond (≥ 5 % of the bid) and meet a series of performance‑bond and insurance requirements. The contract is a lump‑sum, fixed‑price agreement with work to commence no earlier than August 1 2026, substantial completion by November 1 2026, and final completion by November 15 2026.
• Demolition of existing pavement, curbs, gutters, and sidewalks.
• Installation of 12‑in. reinforced concrete storm‑sewer pipe, manholes, and related utilities.
• New concrete and asphalt pavement, curb‑and‑gutter systems, sidewalks, and curb ramps.
• Street‑lighting poles, conductors, and related electrical work.
• Traffic‑control devices, erosion‑control measures, and post‑construction landscaping.