This MassDOT solicitation calls for a contractor to perform scheduled and emergency drainage, slope stabilization, and roadway repair/improvement work along Interstate 90 within District 1. The work includes adjusting or rebuilding drainage structures, installing new drainage pipes, repairing culverts, performing concrete and pavement repairs, installing rumble strips and temporary traffic‑control devices, and providing emergency‑response capability. The contract is valued at approximately $1.73 million and is SBPP eligible. Bidders must obtain a Digital ID, submit a 5 % bid bond, and comply with strict start‑time windows (10 days for scheduled work, 4 hours for emergency work) with penalties for non‑response. The solicitation requires adherence to prevailing‑wage rules, extensive environmental and utility‑coordination documentation, and a suite of special provisions covering safety, labor‑participation goals, and equipment certification.
• Scope: Drainage structure repair/reconstruction, new pipe installation, roadway resurfacing, rumble‑strip installation, and emergency response on I‑90.
• Budget: Estimated total $1,730,000; SBPP eligible; 5 % bid bond required.
• Key requirements: Digital ID, bid bond, compliance with labor‑participation goals, utility surveys, environmental permits, and strict response timelines with $500‑$1,000 per‑day penalties.