This solicitation calls for a qualified contractor to demolish interior office finishes on the third floor of the DPCC building in Miami, handling asbestos and mold remediation, removal of ceiling grids, HVAC ductwork, drywall, flooring, bathroom and lounge fixtures, and disposing of all debris through two west‑side windows. The contractor must provide its own dumpster, manage waste diversion (≥ 50 % recycling), obtain all required permits, and adhere to strict access and safety constraints. The work must be completed within 39 calendar days after mobilization.
• Full interior demolition, including ceiling grid, HVAC, electrical, drywall, carpet, bathroom and lounge fixtures.
• Hazardous‑material abatement (≈ 60 sf asbestos, ≈ 1,100 sf mold) with required monitoring and reporting.
• Debris removal exclusively via two west‑side windows; contractor supplies and pays for dumpster and cleaning.
• Mandatory pre‑bid meeting/site visit on May 7, 2026; RFIs due May 12, 2026; electronic bid submission by May 22, 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.