Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Racquet Club Road Reconfiguration

City of Palm Springs·California

Racquet Club Road Reconfiguration

Closes 6/18/2026$3M – $4.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Palm Springs is seeking qualified contractors to reconfigure Racquet Club Road and North Farrell Drive, installing Class II bicycle lanes, updating signage, striping, and pavement, and converting the existing four‑lane roadway to a three‑lane cross‑section with a two‑way left‑turn lane and curbside parking. The work must be completed within a tight 40‑working‑day schedule, and the contractor must meet extensive California public‑works requirements, including prevailing‑wage compliance, a Class A contractor’s license, a 10 % bid bond, and a 25 % warranty bond. The project’s estimated construction cost is $3.8 million. • Install Class II bike lanes and related pavement markings along Racquet Club Road and North Farrell Drive. • Re‑configure roadway from four travel lanes to three lanes (one each direction) plus a two‑way left‑turn lane and designated curbside parking. • Provide all associated signing, striping, curb‑ramp, sidewalk, and pavement‑improvement work per Caltrans “Greenbook” specifications. • Deliver required bonds, certifications, and compliance documents (PLA, public‑integrity disclosure, prevailing‑wage payroll, etc.) before starting work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Anthony Acosta(Engineering)

[email protected]

(760) 323-8253

Key dates

Opened
5/28/2026
Questions due
6/10/2026
Closes
6/18/2026
Projected award
7/8/2026
Duration
40 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BID 22-21B

Budget estimate

$3,000,000 – $4,500,000

The engineer’s estimate for the project is $3.8 million. Considering typical contractor profit and overhead ranges (10 % each) and potential change‑order adjustments, the net earnings for the prime contractor are likely to fall between roughly $3.0 million (lower‑bound if many change orders reduce scope) and $4.5 million (upper‑bound if the full estimate is realized with minimal deductions).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fort Wayne·Indiana

Top match · 63%

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Raleigh Durham Airport Authority·North Carolina

62% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

City of Charlotte·North Carolina

62% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

City of Ontario·California

62% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

61% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

City of Charlotte·North Carolina

61% match

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

City of Charlotte·North Carolina

61% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

City of Hastings·Nebraska

61% match

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

Department of Parks, Recreation and Tourism·South Carolina

61% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

City of Abbeville·South Carolina

61% match

CTC Road Improvements – Perry/New/Conway

Closes 11/13/2026Opened 10/14/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

60% match

STSRR PROJECT 21-7 STREETS IN TARA,OXFORD,SHERWOOD FOREST, DARRYL,BARD

Closes 11/3/2026Opened 10/6/2026

City of Charlotte·North Carolina

60% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Miami-Dade County Department of Transportation and Public Works·Florida

60% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Hampton·Virginia

60% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Toledo·Ohio

60% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

Anderson School District One·South Carolina

60% match

Tennis Court Resurfacing

Closes 11/9/2026Opened 10/21/2026

City of Torrance·California

60% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of Pueblo·Colorado

60% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026

City of Dunedin·Florida

60% match

ELIZABETH SKINNER JACKSON BASKETBALL COURT REFINISH

Closes 11/16/2026Opened 10/13/2026

Brazos Valley·Texas

60% match

CITY GOLF COURSE CART PATH AND HOLE REPAVING

Closes 11/6/2026Opened 10/13/2026

Ontonagon Valley Sportsmen's Club·Michigan

60% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

Lexington County·South Carolina

60% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

CPPJ Road, Bridge, & Utility·Louisiana

59% match

West Calcasieu Parish Roads and Drainage Rehabilitation

Closes 11/17/2026Opened 10/22/2026

Charleston County·South Carolina

59% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Santa Barbara·California

59% match

Golf Club Green and Tee Box Renovation

Closes 11/9/2026Opened 10/16/2026