Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Construction
  5. ›RFQ 672862: Construction of the Route 7 and Route 690…

County of Loudoun·Virginia

RFQ 672862: Construction of the Route 7 and Route 690 Interchange

Closes 11/19/2025$10M – $50MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Loudoun, Virginia is seeking a qualified General Contractor to construct the Route 7 and Route 690 Interchange Project. The project includes a grade separated barbell interchange at the existing Route 690 overpass over the Route 7 bypass, consisting of a new Route 690 bridge with two roundabouts on either side, on and off ramps from Route 7, widening of Route 7 and its two bridges over Catoctin Creek, and two stormwater facilities. The general scope of work includes surveying, construction layout, maintenance of traffic, earthwork, rock excavation, erosion and sediment control, safety procedures, and compliance with all applicable permits. • The project requires a grade separated barbell interchange at the existing Route 690 overpass over the Route 7 bypass. • The project includes a new Route 690 bridge with two roundabouts on either side. • The project requires on and off ramps from Route 7. • The project requires widening of Route 7 and its two bridges over Catoctin Creek. • The project includes two stormwater facilities.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Melissa Prell(Buyer)

Key dates

Opened
9/23/2025
Closes
11/19/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
IFB-103782

Budget estimate

$10,000,000 – $50,000,000

Based on the scope of work, which includes the construction of a grade separated barbell interchange, a new Route 690 bridge, and the widening of Route 7, the estimated budget for this project could be in the range of $10 million to $50 million. This estimate is based on the complexity of the project, the materials required, and the labor involved. The actual budget could be higher or lower, depending on various factors such as the contractor's bid, the materials used, and the project's timeline.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Smithville·Missouri

Top match · 73%

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

City of Plano·Texas

71% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026

City of Lancaster·Texas

71% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

Brunswick County·North Carolina

71% match

RFQ: Engineering Services for Highway 74 Parallel Force Main

Closes 11/23/2026Opened 10/22/2026

Georgia City of Albany·Georgia

71% match

27-024 Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Binghamton·New York

70% match

RFQ: Preparation of a Lead Service Line Inventory and Lead Service Line Replacement Plan for City of Binghamton Water System

Closes 11/4/2026Opened 10/9/2026

Virginia Department of Transportation·Virginia

70% match

694_2027 LATEX MODIFIED - PRIMARY / SECONDARY

Closes 11/18/2026Opened 10/14/2026

Virginia Department of Transportation - Alternative Project Delivery Division·Virginia

70% match

Virginia Department of Transportation I‑81 Safety and Operational Improvements RFQ

Closes 12/15/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

70% match

RFQ: Start a 100 MB commercial circuit Intra-SWA.

Closes 11/6/2026Opened 10/8/2026

Town of Ponce Inlet·Florida

70% match

RFQ 2026-02 - TOWN OF PONCE INLET COLLECTION SYSTEM IMPROVEMENTS PHASE 1

Closes 11/19/2026Opened 10/20/2026

Greene County·Virginia

70% match

#SMART18 - Route 670 Connector A Design-Build Project

Closes 2/9/2027Opened 10/30/2026

U.S. Department Of Veterans Affairs·California

70% match

Y1LB--FY27 NRM - Correct Mather Loop Road and Install Speed Bumps

Closes 11/2/2026Opened 10/26/2026

City of Lee's Summit·Missouri

70% match

RFQ 2027-017 Design and Construction Services for the 2026 Velie Water Main Rehabilitation or Replacement

Closes 11/18/2026Opened 10/20/2026

Virginia Department of Transportation·Virginia

70% match

B25_2027 SMART SCALE - INTERSECTION IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

Minnesota Department of Transportation·Minnesota

70% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

A501- Alternative Project Delivery·Virginia

70% match

I-81 CIP Ironto Widening Segment M

Closes 12/15/2026Opened 10/22/2026

Cherokee Nation Department of Transportation & Infrastructure·Oklahoma

69% match

Bridge 67 over Pecan Creek – CN‑0938‑23BR

Closes 11/10/2026Opened 10/5/2026

Virgin Islands Port Authority·U.S. Virgin Islands

69% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

City of Albany·Georgia

69% match

Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

69% match

59--CABLE ASSEMBLY,RADIO F

Closes 11/8/2026Opened 10/27/2026