Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›365-27 Culvert Liner Pipe Installation

Ohio Department of Transportation·Ohio

365-27 Culvert Liner Pipe Installation

Closes 10/21/2026$500k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for a contractor to install an owner‑supplied liner pipe inside an existing culvert structure at the GUE‑I77‑14.87 bridge site. The bid must cover all labor, equipment, temporary works, and the use of supplied 142” I.D./144” O.D. conduit and hardware. Bidders must review the site and existing materials before pricing, and any incidental items not on the pricing sheet are to be included in the proposal. The contract includes removal of temporary works after installation. • Install a 142” I.D. liner pipe using supplied smooth‑cor conduit and hardware at a single bridge location. • Provide, modify, and later remove temporary water‑control works (temporary pumping, flow capacity, falsework) as part of the scope. • Review existing conduit and hardware on‑site to determine resupply needs; all costs for resupply, installation, and site preparation are included in the bid.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
10/2/2026
Questions due
10/15/2026
Closes
10/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
SRC0000042295

Budget estimate

$500,000 – $1,200,000

Based on the scale of the project—large‑diameter conduit, extensive temporary works, and full site preparation—the contract value is likely in the mid‑six‑figure range. Comparable Ohio DOT culvert rehabilitation projects of similar size typically run between $500,000 and $1,200,000, depending on site conditions, material resupply needs, and labor rates. Therefore, a reasonable estimate is $500K‑$1.2M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Illinois DOT - Transportation·Illinois

Top match · 70%

FY27 Culvert Liners

Closes 11/10/2026Opened 10/26/2026

Saline County·Kansas

69% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

California Department of Transportation·California

66% match

Install welded steel pipe; structural concrete; & alt pipe culvert.

Closes 12/3/2026Opened 10/19/2026

City of Ladue·Missouri

66% match

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

Arkansas Department of Transportation - Equipment and Procurement·Arkansas

65% match

Corrugated Pipe Culvert Supply Contract

Closes 11/10/2026Opened 10/27/2026

West County Wastewater·California

65% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Ohio Department of Transportation·Ohio

64% match

D08-RFQ-2143 Tunnel Liner

Closes 11/10/2026Opened 10/27/2026

Gary Sanitary District·Indiana

64% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

Oregon Department of Transportation·Oregon

64% match

US199 @ Demaray Dr MP 2.33 Culvert Replacement Project

Closes 11/11/2026Opened 10/27/2026

Snohomish County·Washington

64% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

City of Marysville, Ohio·Ohio

64% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

Pennsylvania Department of Transportation·Pennsylvania

64% match

SR117 Thermoform PVC Pipe Lining

Closes 11/3/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

64% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

Saline County·Kansas

64% match

2027 Roadway Materials - Pipe Culverts

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Defense·New Hampshire

63% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

City of Sidney·Ohio

63% match

26-26 Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

Georgia City of Covington·Georgia

63% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026

New York State Department of Transportation·New York

63% match

D265814 CULVERT REPLACEMENTS - Route 22 and Route 67 Culverts in the Towns of Ballston, Milton & Willsboro.

Closes 11/12/2026Opened 10/20/2026

St. John the Baptist Parish Government·Louisiana

63% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

City Utilities·Indiana

63% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

City of San Bernardino·California

63% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Bellevue·Washington

63% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Redlands·California

62% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Georgia City of Sandy Springs·Georgia

62% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

U.S. Department Of Agriculture·Kentucky

62% match

Lagoon Aeration

Closes 11/19/2028Opened 11/6/2024