Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Structural Concrete Floor Repair - Stratford Transfer…

Connecticut Town of Stratford·Connecticut

Structural Concrete Floor Repair - Stratford Transfer Station

Closes 5/7/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Stratford is seeking bids for the structural concrete floor repair at the Stratford Transfer Station. The project involves removing portions of the existing slab within the repair area to the indicated depth and installing a new reinforced topping slab. The transfer station shall remain open and operational during the work, and all work needs to be phased accordingly. The bid documents include a detailed description of the scope of work and the requirements for the project. The key aspects of the project include: • Removing portions of the existing slab within the repair area to the indicated depth • Installing a new reinforced topping slab • Phasing the work to ensure the transfer station remains open and operational during the project • Submitting all requests for information in writing to the email address above • Not accepting verbal communication The project requires specialized trade construction and maintenance services, including concrete installation and repair services, concrete reinforcement placing service, and building and facility construction and maintenance services.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Phillip Ryan(Purchasing Agent)

[email protected]

Key dates

Opened
4/6/2026
Closes
5/7/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
BID 2026-24

Budget estimate

$100,000 – $500,000

The budget for this project is estimated to be between $100,000 and $500,000. This estimate is based on the scope of work, which involves removing and replacing the existing slab and installing a new reinforced topping slab. The factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the location of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Omaha Public Schools·Nebraska

Top match · 68%

Transportation South Flooring

Closes 11/25/2026Opened 10/26/2026

Connecticut City of Norwich·Connecticut

67% match

Greeneille fire House Floor Repair

Closes 11/5/2026Opened 10/7/2026

Corrections and Community Supervision, NYS Dept. of·New York

67% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

Niagara Frontier Transit Authority (NFTA)·New York

66% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

Port of Portland·Oregon

66% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Wilton Manors·Florida

66% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of Gainesville - Procurement Division·Florida

65% match

Transit Bus Yard Pavement Repair and Leveling

Closes 12/9/2026Opened 10/28/2026

City of Wilton Manors·Florida

65% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

65% match

Wawa Station Parking Garage Spall Repairs

Rolling / TBD closeOpened 7/11/2026

Delaware Solid Waste Authority·Delaware

64% match

Repairs to Buildings 1, 2 and 3 at the Pine Tree Corners Transfer Station

Closes 11/4/2026Opened 9/23/2026

University of North Dakota·North Dakota

64% match

UND Campus Concrete Contract

Closes 11/5/2026Opened 10/12/2026

City of Madison·Mississippi

64% match

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

Brazos Valley·Texas

64% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

Massachusetts City of Lawrence·Massachusetts

64% match

Cementitious-Urethane (Epoxy) Flooring

Closes 11/5/2026Opened 10/21/2026

University of South Carolina·South Carolina

64% match

Repair and Refinish Gym Floors

Closes 12/2/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Virginia

64% match

LOADING DOCK CONCRETE REPAIRS

Closes 11/10/2026Opened 10/23/2026

Connecticut Greater Hartford Transit District·Connecticut

64% match

GHTD IFB #03-027 Third Floor Accessible Bathroom Conversion - Union Station

Closes 12/5/2026Opened 10/29/2026

U.S. Department Of Homeland Security·Connecticut

64% match

Floor Refinishing Services

Closes 11/13/2026Opened 10/30/2026

City of Irving·Texas

64% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

Central Arkansas Water·Arkansas

64% match

Annual Concrete Surface Repairs – 2027 (30 Day Option)

Closes 11/17/2026Opened 10/18/2026

Texas Health & Human Services Commission·Texas

64% match

Rio Grande State Center needing removal and installation of flooring in Unit 1, Building 515

Closes 11/5/2026Opened 10/15/2026

Dillwyn Correctional Center·Virginia

63% match

Resinous Industrial Floor Coating Furnish and Install

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Agriculture·Mississippi

63% match

Ashe Nursery Floor Repair/Replacement

Closes 11/23/2026Opened 10/23/2026

City of Lawrence·Massachusetts

63% match

Cementitious-Urethane (Epoxy) Flooring Installation

Closes 11/5/2026Opened 10/20/2026

Raleigh Durham Airport Authority·North Carolina

63% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026