Hancock County is rebidding the construction of a Gas Collection and Control System (GCCS) for Unit 2 Phase 3 at its sanitary landfill in Findlay, Ohio. The contractor will install a perimeter header, horizontal collector, lateral/header piping, wellheads, and associated valves and manifolds, complying with Ohio EPA solid‑waste permit requirements and prevailing‑wage statutes. The work is fully scoped in a detailed bid package, with engineering quantities provided for pricing, and must be completed within 90 calendar days of commencement.
• Scope includes trenching, HDPE pipe installation (12″, 8″, 6″), blind flanges, isolation valves, drip legs, collection manifolds, and a 1,920 lf horizontal collector system.
• Mandatory pre‑bid online meeting on 13 May 2026; questions must be submitted by 10 July 2026.
• Bid submission is electronic‑only via BidExpress; required bid bond is 10 % of the bid (or full‑value guaranty) and a 100 % performance bond upon award.
• Contractor must meet Ohio prevailing‑wage requirements, provide extensive affidavits (non‑collusion, tax, insurance, hold‑harmless, etc.), and maintain $1 M insurance limits.