Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Air Launched Cruise Missile (ALCM) Elevon Actuator…

U.S. Department Of Defense·Oklahoma

Air Launched Cruise Missile (ALCM) Elevon Actuator Controller Phase III Remanufacture

Closes 5/18/2026$10M – $50MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Air Force intends to award a sole source contract to the Boeing Company for the remanufacture of the Air Launched Cruise Missile (ALCM) Elevon Actuator Controller (EAC) component. The contractor will be responsible for disassembling, cleaning, inspecting, maintaining, reassembling, testing, and finishing the EAC units, as well as producing EAC Production Test Sets and associated Test Program Sets. The contract will be an IDIQ contract with a period of performance from July 2026 to July 2033. The contract type will be a combination of Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Cost Reimbursement (CR), and Cost Plus Incentive Fee (CPIF). Some key points to consider are: • The contract is a sole source award to the Boeing Company. • The period of performance is from July 2026 to July 2033. • The contract type will be a combination of FFP, CPFF, CR, and CPIF. • The contractor will be responsible for remanufacturing the EAC component and producing EAC Production Test Sets and associated Test Program Sets. • The contract will include a small business participation requirement.

Attached files

Contact

Natalie Stokely(Contracting Officer)

[email protected]

(918) 429-3748

Key dates

Opened
3/6/2026
Closes
5/18/2026
Projected award
8/1/2026
Duration
7 years

Last updated

Details

Type
Sole Source
Industry
Aerospace and Defense
NAICS
336419
Solicitation №
FA812826RB001

Budget estimate

$10,000,000 – $50,000,000

The budget for this contract can be estimated based on the scope of work and the period of performance. The contract involves the remanufacture of the EAC component and the production of EAC Production Test Sets and associated Test Program Sets. The period of performance is from July 2026 to July 2033, which is 7 years. Assuming an average annual budget, the total budget for the contract can be estimated to be in the range of $10 million to $50 million. This estimate is based on the assumption that the contractor will be required to remanufacture a significant number of EAC units and produce a substantial number of EAC Production Test Sets and associated Test Program Sets. The actual budget may vary depending on the specific requirements of the contract and the performance of the contractor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 72%

LINEAR ELECTRO-MECHANICAL ACTUATOR / 01F, LGM-30 MINUTEMAN III MISSILE

Closes 11/25/2026Opened 10/9/2026

U.S. Department Of Defense·Missouri

70% match

EDRM - Enhanced Drogue Rocket Motor

Closes 12/8/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

69% match

Remanufacture of B-2 Actuator, Electromechanical, Rotary

Closes 11/19/2026Opened 10/7/2026

U.S. Department Of Defense·California

69% match

ACTUATOR ASSEMBLY

Closes 11/4/2026Opened 9/17/2026

U.S. Department Of Defense·Oklahoma

69% match

RFP- FD20301901983_FA811824R0035 -0003 OH B2 ACTUATORS (Amendment -0003 )

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Missouri

68% match

Avionics Block III FY27 Retrofit for ACS AMS Generation 5 COMM1 Kits

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·New Jersey

68% match

Adapter, Hellfire Missile (Upper) and Adapter, Hellfire Missile (Lower)

Closes 11/10/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

68% match

61--CONTROLLER,ELECTRIC, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026

U.S. Department Of Defense·Utah

68% match

Legacy Attitude Heading & Reference System (AHRS) Component Replacements – Low-cost Avionics Modernization Program II (LAMP II)

Closes 11/3/2026Opened 7/23/2026

U.S. Department Of Defense·United States of America

68% match

Electric Modernization Upgrade

Closes 12/1/2026Opened 8/20/2026

U.S. Department Of Defense·Oklahoma

68% match

ACTUATOR, ELECTROMEC

Closes 11/18/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

68% match

FA811826R0057 - REMAN E-3 AI GEARBOX ASSEMBLY

Closes 11/20/2026Opened 10/6/2026

U.S. Department Of Defense·Texas

67% match

Motor, Control

Closes 11/26/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

67% match

Programmable Logic Controller (PLC) Parts

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Oklahoma

67% match

Upgrade X-Ray Controller

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·Georgia

67% match

AN/ALQ-131(V) Electronic Countermeasures (ECM) Pod Test Lab Equipment

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Defense·Alabama

67% match

Mobile Integrated Launch Capability

Closes 9/30/2028Opened 10/9/2026

U.S. Department Of Defense·United States of America

67% match

ACTUATOR,HYDRAULIC-

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

67% match

Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)

Closes 12/8/2026Opened 10/8/2026

U.S. Department Of Defense·Iowa

67% match

CONTROLLER MONITOR

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·Florida

67% match

Repair of AN/ALQ-131 Power Supplies

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

67% match

ACTUATOR,ELECTRO-ME

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·Georgia

67% match

Cylinder Assembly (Load Arrestor) PN 1171-3

Closes 11/13/2026Opened 10/13/2026

U.S. Department Of Defense·Utah

66% match

Tank Assembly, Oxygen

Closes 6/25/2027Opened 6/25/2026

U.S. Department Of Defense·United States of America

66% match

Tank Assembly, Oxygen

Closes 6/25/2027Opened 6/25/2026