The National Weather Service (NWS) has a requirement for Roof Replacement on the Cooperative Program Manager (CPM) building located at Gray, ME. The contractor shall provide all personnel, materials, labor, equipment, and supervision to complete the roof replacement as per the Statement of Work (SOW). The scope of work requires edge buildup, installation of insulation board, and installation of a new EPDM synthetic rubber membrane. The new roofing system shall be 100% reliable and warranted by the roofing manufacturer for a minimum of twenty (20) years.
• The contractor shall provide qualified personnel to perform all requirements specified in the SOW.
• The contractor shall provide a project manager who shall be responsible for all contractor work performed under this SOW.
• The contractor shall ensure that all work is performed and completed in a workmanship-like manner and in accordance with the latest proven practices of the trade by thoroughly skilled and experienced workers.
• The contractor shall comply with all applicable Government regulations, policies, and procedures.
• The contractor shall provide a field report to the COR and LPOC via electronic mail, including a summary of all contractor work, photos, product specification datasheet, warranty documentation, use and care guidelines, and any contractor concerns or recommendations.